APh e o.:
vocket No. 50-462
,/
j
?
Illinois Power Company
(
ATTN:
Mr. Leonara J. Kocn J
Vice President e
4 ~
500 Soutn 27th Street N
vecatur, Illinois 62a25 N __
Gentlemen:
Illinois Power Company (IP), in a letter to the Office of Nuclear Reactor Regulation (dRR) dated Oc.ober 30, 1981, requested that the Clinton 2 operating license review be postponed s'nce construction of the unit had been deferred indefinitely and IP is not authorizing further expenditure of construction funds.
In addition, IP filed a notice With the Atomic Safety and Licensing board Panel (ASLBP) to sever the pro-ceedings for an operating license for Unit 2 from the proceedings for Unit 1 indi-cating that there was no need to proceed with the application for the Unit 2 oper-ating license.
In their letter dated Noveuber 20, 1981, to your Company, HRR stated that the staff was discontinuing the review of Unit 2.
Also, on ilovember 13, 1981, the ASL6P issued an Order Granting 'iotion for Severance and Stay of Proceedings.
Under 10 CFR Part 170, it is Comission practice to recover review costs using the procedures of Footnote 3 to 10 CFR 170.21 when the review of the project is complete.
Pursuant to 10 CFR 170.lE(b), the review of a project is considered complete "...when a peMait or license is issued, or an application for a permit or license is denied, withdrawn, suspenaed, or action on the application is postponed." We consider the review of tnis project to be indefinitely postponed as of 'lovember 20,19d1, the cate that liRR discontinueo review of Clinton 2.
Accordingly, we have determined the actual professional staff hours expended and contractual costs incurred by the major program offices (except NRR) from February 24,1976 (the date the construction pennit was issued) to November 20,1981 (the date NRR discontinued review).
NRR nas informed us tnat since Clinton 1 and 2 were reviewed concurrently, there was no separate review for Uni t 2.
As a result, all NRR professional staff hours and contractual costs will be billed to Unit 1 upon issuance of the Unit 1 operating license. Actual costs of other offices for the review of Unit 2 were $22,036.
Under the Comission's regulations, we linit the charge for review to the lesser of actual cost or the maximur fee allowed under 10 CFR 170.21(a)A.l. (operating reactor -
custom design - concurrent unit review).
For this review, the actual cost is applicable.
The balance due for the review of the Clinton 2 operating license application, which has now been postponed indefinitely, is 522,080.
)
1 1
]h
'U
APR 8 1982 Illinois Power Company We have notified the NRC Office of tha Controller to issue an invoice to your Company to cover the Commission's review costs of $22,086 for Unit 2.
Sincerely, Oridant Sped by yim, 0, Chr William O. Hiller, Chief License Fee Management Branch Office of Administration DISTRIBUTION:
PDR PNorry, ADM LPDR RFonner, OELD Docket File / WOMiller, LFMB License Fee File CJHolloway, LFMB RMDiggs, LFMB 3
LPTremper, LFMB KLKohler, LFMB LFMB R/F (2) l l
A t
- See attached copy for concurrences.
h-i MB LFMB:ADM OELD LFMk 8
i L..F,g., ADM ornce>
Kk,Kp,h,.,........,,,,
,,C,JHo,1,,1,0way,*,
,,R[p,nne,r,*,,,,,WM1,U gr,,,,,,,
,,,r ;,y,ml sua - c>
42.(/82...,,,,,,,,4z,q/,82.,,,,,,4,Lg,/,8 2.,,,,,,,,4.a.,zg.,,,,,,,,
,,,,,,,,,,,,,,,,......,,,,,,,,,,,,......,..),:
om>
( nne ronu ais oo-comscu ono OFFICIAL RECORD COPY usem i,si-m..ro