ML20052A577
| ML20052A577 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/22/1982 |
| From: | Oprea G HOUSTON LIGHTING & POWER CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10-CFR-50.55E, 10CFR-050.55E, 10CFR-50.55E, ST-HL-AE-817, NUDOCS 8204280474 | |
| Download: ML20052A577 (3) | |
Text
-
The Light Company n,,,,si.,,, us,ii,o i>,,m im, mon n.,,,si.,,,.w.mooi m mmn April 22, 1982 ST-HL-AE-819 SFN: V-0530
]M@MllM93%.,
LI-l>
\\
APR 23 t982
- j o
Mr. John T. Collins gj Regional Administrator, Region IV Nuclear Regulatory Comnission 611 Ryan Plaza Dr., Suite 1000 Arlington, Texas 76012
Dear Mr. Collins:
, pig
' " q,j,'
South Texas Project c/
i Units 1 & 2 f/
Docket Nos. STN 50-498, STf! 50-499
- /
'.2 Fourth Interim Report
- I a 17 :ov Concerning Computer Program Verification 13; "f,
l:
1 On May 8,1981, Houston Lighting & Power Company (HL&P), curs'uant to M 10CFR50.55(e), notified your office of an item concernino computer pr'o3Th\\
gram (code) verification. The verification methods lacked adequate visi=
bility to the user as to whether or not the program versions in use had been verified. The information supplied in this report represents our Fourth Interim Report concerning this item. This report was previously scheduled to be submitted to your office by June 1, 1982.
As prNiously discussed in our Third Interim Report, a consultant firm was engaged by Brown & Root, Inc. (B&R) to address the appropriateness of the modeling options, acceptability of code usage, and acceptability and adequacy of the methods selected for computer program verification. As a recult of a review by BPC of B&R subcontract activities, BPC recommended that the consultant's work be tenninated to avoid unnecessary duplication of BPC transition reviews of past B&R engineering work. Based on the BPC recommendation and additionally, in recognition that the consultant's scope of work was not dispositive of the comouter program verification issue, HL&P directed B&R to terminate the consultant's work in December 1981 except for preparation of a report covering the work already accom-plished. The consultant has prepared and submitted a report on the work completed prior to contract termination.
ffl7 8204.280474
Ilouston Lighting & Power Company April 22,1982 ST-HL-AE-819 SFN: V-0530 HL&P has provided BPC with a copy of the report for their use in review of B&R work as part of the transition work package effort. A copy of the consultant's report is retained in the HL&P files and is available for in-spection by the Nuclear Regulatory Comission (NRC). The next report con-cerning this item will be submitted to your office by September 3,1982.
If you should have any questions concerning this item, please contact Mr. Michael E. Powell at (713) 877-3281.
Very trul -y rs, f.W. O ' a fgT.
Execu ive Vice President l
l MEP/lmf l
l
ilouston Lighting & Power Company cc:
G. W. Oprea, Jr.
April 22,1982 J. H. Goldberg ST-HL-AE-819 J. G. Dewease SFN: V-0530 J. D. Parsons Page 3 D. G. Barker C. G. Robertson R. A. Frazar J. W. Williams J. W. Briskin J. E. Geiger R. L. Ulrey S. M. Dew J. T. Collins (NRC)
D. E. Sells (NRC)
W. M. Hill, Jr.
NRC)
M. D. Schwarz Baker &Botts)
R. Gordon Gooch Baker &Botts)
J. R. Newman Lowenstein, Newman, Reis, & Axelrad)
STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 R. L. Range /G. W. Muench Charles Bechhoefer, Esquire Central Power & Light Company Chaiman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.
20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808. L-46 Livemore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.
20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1 Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Revision Date 03-30-82
.