- h -
I'['
- E
-( y;hp
,p g-1 y
O b g e:
l v
s
- :-j OPERATING'DAT5 REPORT i"* -
DOCKET,NO. 50-266 IC C
D4TE April 6,1982 s
e COMPLETED BY C. W. FAY 10
^
TELEPHONE 414 277 2811 OPERATING STATUS h
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES
- 2. REPORTING PERIOD:
MARCH 1982
+
- 3. LICENSED THERMAL POWER (MUT):
1518..
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER'3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICASLE
- 9. P015R LEVEL TO WHICH RESTRICTED, IF ANY'(NET MWE):
390.-
- 10. REASONS FOR RESTRIC! IONS,.(IF ANY): ' Maximum dependable capacity reduced because of self-imposed hot leg temperature limitation in an attempt to limit steam generator tube corrosion.
THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 2,160 99,936
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL-607.7 2,009.0 82,362.2
- 13. REACTOR RESERVE SHUTD00N HOURS 0.0 10.5 617.8
- 14. HOURS GENERATOR ON LINE 602.6 1,986.1 79,958.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 21.6 785.9
- 16. GROSS THERMAL ENERGY GENERATED (MUH) 792,690 2,592,703 109,945,543
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 265,900 869,310 36,890,590
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 252,939 827,870 35,109,081
(
- 19. UNIT SERVICE FACTOR 81.0 91.9 80.0
- 20. UNIT AVAILABILITY FACTOR 81.0 92.9 80.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 68.7 77.4 72.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 68.4.
77.1 70.7
- 23. UNIT FORCED OUTAGE RATE '
O.0 0.6 3.0
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
N8NE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: APRIL 10, 1982 DATA REPORTED AND Ed iORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point Beach Unit li REPORT MONTH March. 1982 COMPLETED BY C av TELEPHONE 414/277-2811 _
4 m
- w8 a
9 32 "a
3R Ve in
~ e ou o
mee om ce yg g
jjg Licensee Event gg go Cause and Corrective Action No.
Date a
N cm e
a sc Report No.
m EU To Prevent Recurrence i
O~
M gmg g
8 3
820316 S
141.4 B
1 82-007/0lT-0 CB F
The unit was taken off line o4 03/26/82 for a scheduled st aam generator tube inspection.
A hydrostatic test of both steam generators on 03/29/82 revealed three leaking plugs in the "B"
steam generator and one leaking plug in the "A" steam generator.
Eddy current examination is in progress.
1 3
F: Forced Reason:
Method:
Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) 1-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entr(
C-Refueling 3-Automatic Scram Sheets for LER FilG D-Regulatory Restriction 4-Other (explain)
E-Operator Training & License Exam l
F-Administrative 5 Exhibit I-Same
! AD-28B G-Operational Error (explain)
Source (01-78)
H-Other (explain) i
DOCKET NOo 50-266 UNIT NAME Point Beach Unit 1 DATE April 6, 1982 COMPLETED BY C. W.
Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH March, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
423 11 422 21 423 2
423 12 423 22 423 3
422 13 423 23 423 4
422 14 423 24 423 5
421 15 419 25 418 6
423 16 427 26 12 7
411 17 423 27
-8 8
418 18 423 28
-3 i
9 421 19 423 29
-3 10 423 20 424 30
-3 31
-2 i
AD-28A (1-77)
- ~ - -.
i j
NARRATIVE
SUMMARY
OF OPERATING' EXPERIENCE-Docket Na.
50-266
}
Unit Name Point Beach Unit 1 Date April 6, 1982
-Completed By C. W. Fay Telephone 414/277-2811 Unit 1 operated at 422 MWe net with one scheduled outage.
The unit was taken off line at 0338 hours0.00391 days <br />0.0939 hours <br />5.588624e-4 weeks <br />1.28609e-4 months <br /> on 03/26/82 for a scheduled steam generator tube inspection.
A hydro-static test of both steam generators was conducted on 03/29/82 and recommendations were made to weld repair and/or plug.
j tubes in the "A" and "B" generators.
Eddy current testing was in progress at the close of the month.
A 24-hour written notification of the degraded steam
[
generator tubes was made to the NRC on 03/30/82 under j
Licensee Event Report No. 82-907/01T-0.
The outage is proceeding on schedule and the unit should return to power i
generation on 04/10/82.
J I
On 03/12/82, a 24-hour written notification'for Licensee Event Report No. 82-006/01T-0 on leakage of containment isolatior. valves in excess of allowable limits was issued.
The situation was discovered during the assemblage of the i
Unit 1 10 CFR 50 Appendix J containment leak rate testing report.
It was found that the total Type "B" and "C".as-found leakage for 1979 and 1980 exceeded the Technical Specification limit, but no report was filed.
In both cases, one valve was the cause of the high leakage; the service air supply check valve in 1979 and the component cooling to the "B"
reactor coolant pump check _ valve in 1980.
The valves were repaired and the leakage was well below the allowable limits in each case before the unit
~
l was returned to service following the refueling outages.
Also, in both cases, the second isolation valve was tested l
satisfactorily thus preventing any safety concern.
On 03/23/82, three items of deficient installation were noted on the Unit 1 containment pressure transmitters.
j The deficiencies involved-improper installation of conduit.
It was determined that transmitters lPT-945, 1PT-946 and i
l 1PT-949 were not operationally affected.
Two of the de-i ficiencies were immediately corrected and the third one is undergoing evaluation at this time.
A 30-day Licensee Event Report will be filed on this event.
t Safety-related maintenance included installation of seismic restraints and TMI electrical equipment backfitting.
(
l
OPERATING DATA REPORT DOCKET NO. 50-301 DATE April 6, 1982 COMPLETED BY C. U. FAY TELEPHONE 414 277 2811 GPERATING STATUS
'"~
"~
- 1. UNIT NAME: POINT BEACH tiUCLEAR PLANT UNIT 2
$ NOTES
- 2. REPORTING PERIOD:
MARCH 1982
- 3. LICENSED THERMAL POUER (NUT):
1518.
- 4. NAnEPLATE RATING (GROSS nUE):
523.8
- 5. DESIGN ELECTRICAL RATIriG (NET nUE):
497.
- 6. nAXInun DEPENDABLE CAPACITY (GROSS MUE):
519.
- 7. HAXInun DEPENDABLE. CAPACITY (HET nWE): 495.
- 8. IF CHAtiGES OCCUR Irl CAPACITY RATINGS (ITEMS NonbER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF AN.Y (NET NUE): _NOT APPLICABLE
- 10. REASONS FOR RESTRICl10NS, (lF ANY): NOT APPLICABLE
- THIS NONTH YR TO DATE CUdulATIVE
- 11. HOURS IN REPORTING PERIOb 744 2,160 84,721
- 12. NUdBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 76,550.4
- 13. REACIOR RESERVE SHUIDOWN HOURS 0.0 -
0.0 193.0
- 14. HOURS GENERATOR ON LINE 744.0 2,160.0 75,218.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 178.0
- 16. GROSS THERNAL ENERGY GENERATED (huh) 1,091,347 3,203,566 103,460,410
- 17. GROSS ELECTRICAL ENERGY GENERATED (MUH) 372,780 1,085,270 35,108,280
- 18. NET ELECTRICAL ENERGY GENERATED (nuH)
'356,815 1,038,993 33,422.459
- 19. UNIT SERVICE FACTOR 100.0 100.0 88.8
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 89.0
- 21. UNIT CAPACITY FACTOR (USING nDC NET) 96.9 97.2 80.3
- 22. UNIT CAPACITY FACTOR (USING DER. NET) 96.5 96.8 79.4 Z3. UNIT FORCED OUTAGE RATE 0.0 0.0 1.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
April 16, 1982 to last approximately 6 weeks for refueling and backfitting.
- 25. IF SHUTDOUN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 REPORT MONTH March, 1982 COMPLETED C
av TELEPHONE 414/277-2811
~
c W tp o 32 "c
St Pe in
~ e ou o
co v e om ce No.
Date g
ng jjg Licensee Event y
y Cause and Corrective Action a
e om e
v.c Report No.
m Eo To Prevent Recurrence o~
m gmg g
8 I
3 F: Forced Reason:
Method:
Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) l-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Enty C-Refueling 3-Automatic Scram Sheets for LER Fil(
D-Regulatory Restriction 4-Other (explain)
E-Operator Training & License Exam F-Administrative 5 Exhibit I-Same AD-28B G-Operational Error (explain)
Source (01-78)
H-Other (explain) 5
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE April 6, 1982 COMPLETED BY C.
W.
Fay i
TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH March, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
489 11 484 21 481 2
487 12 487 22 479 3
486 13 487 23 475 4
485 14 486 24 474 5
482 15 485 25 472 6
486 16 486 26 472 7
485 17 485 27 467 8
480 18 482 28 466 9
482 19 482 29 465 10 486 2A 482 30 465 31 460 AD-28A (1-77)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-301 Unit Name Point Beach Unit 2 Date April 6, 1982 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at 480 MWe net with no significant load reductions.
There was no safety-related maintenance performed during the period.
1
_