Forwards IE Insp Rept 50-373/82-22 on 820331-0402,09 & 12-13.No Noncompliance Noted
ML20052A339
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 04/22/1982
From: Roy G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20052A340 List:
References
NUDOCS 8204280232
Download: ML20052A339 (2)


See also: IR 05000373/1982022

Text

3

[a .Lr DJ r"5b i 1 %d A i u.:g f"v'igV

1

%A.li i

.

.

APR 2 21982

<3

%

O

%

RECEjygg

3

2

Docket No. 50-373

7

= gR28 ;g '8-

-

.

-

Commonwealth Edison Company

\\

ATrN:

Mr. Cordell Reed

Vice President

g

g

Post Office Box 767

Chicago, IL 60690

0

Gentlemen:

This refers to the pre-operational physical protection inspection

conducted by Messrs. T. J. Madeda, J. L. Belanger, B. W. Stapleton and

Ms. G. M. Christoffer of this office on March 31 through April 2, 9 and

12-13, 1982, of activities at the LaSalle County Nuclear Power Station,

Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to the

discussion of our findings with Messrs. B. B. Stephenson, R. H. Holyoak

and other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Areas examined during this inspection concern a subject matter which is

exempt from disclosure according to Section 73.21(c)(2), Part 73, Title 10,

Code of Federal Regulations. This information must be handled and protected

in accordance with the provisions of 10 CFR 73.21.

Consequently, the enclo-

sure to this letter and our report of this inspection will not be placed in

the Public Document Room.

'D A4 F ;

f60 L

Enclosure Contains

hl/

SAFEGUARDS INFORMATION

,

.

Upon Separation This

2042soMB

Page Is Decontrolled

.

Q

A

J

e

4

.

,

,

.

.

1

b2

Commonwealth Edison Company

2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

)

.

\\/

b

l

G. W. 'Roy, Acting Chief

Technical Inspection Branch

Enclosure:

Inspection Report

No. 50-373/82-22(DETP)

(SAFEGUARDS INFORMATION)

cc w/ enc 1:

Louis O. De1 George, Director

of Nuclear Licensing

R. Cosaro, Site Construction

Superintendent

'

T. E. Quaka, Quality

Assurance Superviaor.

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

cc w/ enc 1, w/o SAFEGUARDS

l

INFORMATION:

Mary Jo Murray, Office of

Assistant Attorney General

RIII

RIII

RIII

/

II

RIII

RJII

I

l

/*'

-

f

. CT $4W

.

.

M e a/so

Be anger Chri offe

pleton

Walker

oy

l

P

@)/O

{Ofga

4/19/82

i

l

!

Enclosure Contains

l

SAFEGUARDS INFORMATION

'

Upon Separation This

Page Is Decontrolled

!

i

'

. - .

._

_ _

___

. ~ .

.

-

.

_. _ . .

, ,_

-

_