3
[a .Lr DJ r"5b i 1 %d A i u.:g f"v'igV
1
%A.li i
.
.
APR 2 21982
<3
%
O
%
RECEjygg
3
2
Docket No. 50-373
7
= gR28 ;g '8-
-
.
-
Commonwealth Edison Company
\\
ATrN:
Mr. Cordell Reed
Vice President
g
g
Post Office Box 767
Chicago, IL 60690
0
Gentlemen:
This refers to the pre-operational physical protection inspection
conducted by Messrs. T. J. Madeda, J. L. Belanger, B. W. Stapleton and
Ms. G. M. Christoffer of this office on March 31 through April 2, 9 and
12-13, 1982, of activities at the LaSalle County Nuclear Power Station,
Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to the
discussion of our findings with Messrs. B. B. Stephenson, R. H. Holyoak
and other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
Areas examined during this inspection concern a subject matter which is
exempt from disclosure according to Section 73.21(c)(2), Part 73, Title 10,
Code of Federal Regulations. This information must be handled and protected
in accordance with the provisions of 10 CFR 73.21.
Consequently, the enclo-
sure to this letter and our report of this inspection will not be placed in
the Public Document Room.
'D A4 F ;
f60 L
Enclosure Contains
hl/
SAFEGUARDS INFORMATION
,
.
Upon Separation This
2042soMB
Page Is Decontrolled
.
Q
A
J
e
4
.
,
,
.
.
1
b2
Commonwealth Edison Company
2
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
)
.
\\/
b
l
G. W. 'Roy, Acting Chief
Technical Inspection Branch
Enclosure:
Inspection Report
No. 50-373/82-22(DETP)
(SAFEGUARDS INFORMATION)
cc w/ enc 1:
Louis O. De1 George, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
'
T. E. Quaka, Quality
Assurance Superviaor.
R. H. Holyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
cc w/ enc 1, w/o SAFEGUARDS
l
INFORMATION:
Mary Jo Murray, Office of
Assistant Attorney General
RIII
RIII
RIII
/
II
RIII
RJII
I
l
/*'
-
f
. CT $4W
.
.
M e a/so
Be anger Chri offe
pleton
Walker
oy
l
P
@)/O
{Ofga
4/19/82
i
l
!
Enclosure Contains
l
SAFEGUARDS INFORMATION
'
Upon Separation This
Page Is Decontrolled
!
i
'
. - .
._
_ _
___
. ~ .
.
-
.
_. _ . .
, ,_
-
_