Forwards Documents Re Diablo Canyon Design Verification Program Requested at 820407 Public Meeting for Placement in Lpdr
ML20052A203
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/21/1982
From: Souder J
NRC OFFICE OF THE SECRETARY (SECY)
To: Hickman L
NRC
Shared Package
ML20052A202 List:
References
NUDOCS 8204280002
Download: ML20052A203 (2)


Text

  1. '

3 UNITED STATES

[4 h

NUCLEAR REGULATORY COMMISSION 3g. g WASHINGTON. D. C. 20555 W

...a /

April 21,1982 Docket Nos. 50-400/401 NOTE TO: Linda Hickman At the pub 1'ic meeting that was held on ' April 7,1982, regirdin' g Shearon Harris, local citizens requested access to documents regarding the Diablo

~

Canyon Design Verification Program.

Members. of the NRC sta ff indicated

~

they would assemble 'a set 'of such documints to provide interested persons with information on'the backgroun' and status of that program.

It was-d agreed that these documen'ts would be sent to the LPDR where the public

~

would be able to revisw 'them.

A lis'!of the document's is attached to t

this note.

' Enclosed is a three-ring note. book containing the documents themselves.

Please place the notebook on the shelf with the Category H (General Correspondence) material.

As always, feel free 1:o cont'act me or Sandy Schlosser should you or your patrons have questions'or concerns hegarding the LPDR program and the availability of documents. -Our to'll free number is 800-638-808'l.

f l 4.

wun)

J na 'i. ' Souder, Chief cal Public Document Room

~

Branch 1

820428m @ b

/

'~

Listing of Documents Regarding D_iabio Canyon Des'ign veriTication Program

- ~ - ~

1.

Commission Order CLI-81-30, November 19, 1981 2.

Letter H. R. Denton, NRR, to M..H.

Furbush, PG&E, November 19, 1981 3.

Letter M. H. Furbush, PG&E, to H. R. Denton, NRR, December 4, 1981 transmitting detailed program plan for independent seismic design verification.

4.

Commission Paper SECY-82-89, March 1, 1982 transmitting NRC staff evaluation of Diablo Canyon proposed seismic design verification program.

5.

Letter P. Crane, PG&E, to H. R. Denton, NRR and R. H. Engelken, RV, March 30, 1982 transmitting PG&E tenth semimonthly status report including updated list of open items and errors.

6.

W. E. Cooper, TES, to G. A. Maneatis, PG&E, et.al. transmitting TES Program Management Plan - Phase I for Independent Design Verification Program, April 2, 1982 u