3 UNITED STATES
[4 h
NUCLEAR REGULATORY COMMISSION 3g. g WASHINGTON. D. C. 20555 W
...a /
April 21,1982 Docket Nos. 50-400/401 NOTE TO: Linda Hickman At the pub 1'ic meeting that was held on ' April 7,1982, regirdin' g Shearon Harris, local citizens requested access to documents regarding the Diablo
~
Canyon Design Verification Program.
Members. of the NRC sta ff indicated
~
they would assemble 'a set 'of such documints to provide interested persons with information on'the backgroun' and status of that program.
It was-d agreed that these documen'ts would be sent to the LPDR where the public
~
would be able to revisw 'them.
A lis'!of the document's is attached to t
this note.
' Enclosed is a three-ring note. book containing the documents themselves.
Please place the notebook on the shelf with the Category H (General Correspondence) material.
As always, feel free 1:o cont'act me or Sandy Schlosser should you or your patrons have questions'or concerns hegarding the LPDR program and the availability of documents. -Our to'll free number is 800-638-808'l.
f l 4.
wun)
J na 'i. ' Souder, Chief cal Public Document Room
~
Branch 1
820428m @ b
/
'~
Listing of Documents Regarding D_iabio Canyon Des'ign veriTication Program
- ~ - ~
1.
Commission Order CLI-81-30, November 19, 1981 2.
Letter H. R. Denton, NRR, to M..H.
Furbush, PG&E, November 19, 1981 3.
Letter M. H. Furbush, PG&E, to H. R. Denton, NRR, December 4, 1981 transmitting detailed program plan for independent seismic design verification.
4.
Commission Paper SECY-82-89, March 1, 1982 transmitting NRC staff evaluation of Diablo Canyon proposed seismic design verification program.
5.
Letter P. Crane, PG&E, to H. R. Denton, NRR and R. H. Engelken, RV, March 30, 1982 transmitting PG&E tenth semimonthly status report including updated list of open items and errors.
6.
W. E. Cooper, TES, to G. A. Maneatis, PG&E, et.al. transmitting TES Program Management Plan - Phase I for Independent Design Verification Program, April 2, 1982 u