Informs of Upcoming Site Visit to Review Functions of Safety Review Groups Including Iseg,Util Review Group & Plant Review Group.Visit Will Be Arranged Before Jul,1982
ML20051R664
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/05/1982
From: Varga S
Office of Nuclear Reactor Regulation
To: Delgeorge L
COMMONWEALTH EDISON CO.
References
NUDOCS 8205170480
Download: ML20051R664 (3)


Text

,

G C

MAY 0 51982 Distribution:

Docket File Docket Hon. 50-295 NRC PDR g (Le ! /

50-304 Local PDR SV

~

ORB #1 Rdg 8

-3

\\

.S^

y \\'i D. Eisenhut g

,L' fd

,S OELD Mr. Louis 0. DelGeorge 4

d h.

OI&E (1)

T

.g8.pkc 'l'./

Director of Nuclear Licensing DWigginton tr Commonwealth Edison Company i*f@;.

hf NSIC Post Office Box 767 t

N ACRS (10) g

'0 j @dy,/ '

Chicago, Illinois 60690 CParrish

~

J. Heltemes

Dear Mr. DelGeorge:

As part of the Division of Human Factors (DHFS) Safety Technology program, a review of the use of ISEGs is being conducted under contract by the Battelle-Pacific Northwest Laboratories (PNL). The purpose is to determine current industry practices to assist in developing our long-term regulatory policy in this area.

Site visits at selected utilities and plants are being conducted to obtain relevant information. The topic areas covered include the functions of

_ safety review groups including the ISEG, Utility Review Group, and Plant Review Group.

The NRC Project Manager will contact you in the near future to arrange a site visit at a mutually convenient time between now and July 1982. The site visits may take up to three days and may involve meetings at the corporate level with people such as the vice president for nuclear operations and members of the utility review group; and at the plant level with the plant manager, members of the plant review group, and the ISEG.

It is also expected that members of the Region III Office and tl.e Resident Inspector will participate in the discussions.

This letter confirms that the contracts made regarding these site visits are endorsed by the NRC.

Further, it reinforces that arrangements for the site visit are voluntary on the part of the utility and the individuals. Your cooperation is greatly appreciated.

If you have any questions, please contact Mr. John A. Zwolinski, (301) 492-8460.

Sincerely, Originalsigned by S:ma A.Varga Steven A. Varga, Chief 82051704%O p Operating Reactors Branch #1 cc: See next page D. Hayes, Reg III 1

JL

~

.DLb.Nf.L L..;.0.!$4.4dL..;.0....

..DWi gintony ga N ak omen

, J,,

sua-o

,A,,Q( /8 A,,,,,

.p/82 y....f.....K. 2 S

p a

om>

OFFICtAL RECORD COPY usanoassi-meeo nne ronu ais tio-sci Nacu o24o

~

t

.y l

y Distribution:

,~

Docket Hos. 50-295 Docket Fijle 50-304 NRC PDR 4 Local PDR s

ORB #1/Rdg D. Eisenhut Mr. Louis 0. DelGeorge OELDf Director of Nuclear Licensing.

OI&E(1)

Commonwealth Edison Company DWJgginton Post Office Box 767

.MGIC Chicago, Illinois 60690 I

i ACRS (10) s

CParrish s

Dear Mr. DelGeorge:

-R

l. Heltemes c,.

i As part of ce OfvDion of Human Factors (DHFS) Safety Technolcgy program, m

a review of the use of ISEGs is being conductsd under contract by the Battelle-Pacific Northwest Laboratories (PHL).c The purpose is to determine current industry practices to assist in developing. cur long-term regulatory' policy in this Area.

Site visits at selected utilities and plants are b' ding conducted to'obtain relevant infomattw. The topic areas covered include the functions 'of safety review groups including th'

~, Utility Review Group, and Plant Review Group.

n The NRC Project Manager will contact,you in the near future to arrange a site visit at a mutually, convenient, time between now and Olly 1982. The site visits may1take up~ to three days end may involve meetings at the corporate level with people such at the vice president for nuclea

  • operations and members of the utility reviewfgroup; and at the plant level with'the s

plant manager, ~ members of the plant review group 'and the ISEG. It is also expected that members of the Region III Office and the Resident InsDector will participate in the discussions.

b This letter confirms that'the contacts made regarling these site visits are endorsed by the NRC. Further, it reinfarces that arrangements for the site visit are voluntary on the part of the' utility and the individuals. Your cooperation is greatly appreciated.

If you have any questions, pleace contact Mr. John A. Zwolir. ski, (301) 492-8460.

Sincerely, c

Darrell G. Eisenhut', Director

[

Division of Licensing cc: See next page D

  1. 1 DL:0RB#1.

DL:0R L D*

omc,,

sun==e > DW.!...9n.:,p...fga,r.ga TMNoyak

- i s q~

. 5/..../. 82

.. 5. /....../.8 2........

5../....../. 8 2.....-

....8..........

oney OFFICIAL RECORD COPY us e tesi-msem NRC FORM M 0044 NRCM Om

o Mr. Louis 0. De1 George Commonwealth Edison Company cc: Robert J. Vollen, Esquire 109 North Dearborn Street Chicago, Illinois 60602 Dr. Cecil Lue-Hing Director of Research and Development Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Zion-Benton Public Library District 2600 Emmaus Avenue Zion, Illinois 60099 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law One First National Plaza 42nd Floor Chicago, Illinois 60603 Susan N. Sekuler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 U. S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 James P. Keppler Regional Administrator - Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

. _..