ML20051L606
| ML20051L606 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 05/05/1982 |
| From: | Gibson A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Damore M WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| References | |
| NUDOCS 8205170315 | |
| Download: ML20051L606 (2) | |
Text
7 hy)
,A MAttntAt tRANMITim HtM coNTAINS 2J90 INfoRMATioN
~
~
MAY 5 1982 4
e P
1 RECEPMD Westinghouse Electric Corporation f
ATTN: Mr. M. D' Amore, Manager 5
MAY 171982>- -8 Columbia Plant s w imm manum R Nuclear Fuel Division so eu g
g Drawer R Columbia, SC 29250 g
g Gentlemen:
Subject:
Report No. 70-1151/82-09 This refers to the routine safeguards inspection conducted by Mr. D. W. Jones of this office on April 19-23, 1982, of activities authorized by NRC License No. SNM-1107 at Westinghouse Electric Corporation, Columbia Plant and to the discussions of our findings held with you and members of your staff at the conclusion of the inspection.
Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, Code of Federal Regulations, Part 70, "Special Nuclear Material," and specific license conditions. Within these areas, the inspection consisted of selective examina-tions of procedures and representative records, interviews with personnel, performance tests, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, the enclosed report with the exception of the cover page, which is an inspection summary, will ng be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, A. F. Gibson, Chief Technical Inspection Branch Division of Engineering and Technical Programs Enclosures (See Page 2) 8 2 0 51'7 0 3 / f' g
i 1AATERIAL TRANSMITTED HEREWITH CoNTAINS 2Jto INFORMATioN Eo3
MATf tfAt TgANSYlTTED LfR(W1TH CoNTAINS 2.790 INrord%T1CN Westinghouse Electric Corporation 2
g
Enclosures:
1.
Inspection Report No. 70-1151/82-C9 (Exempt from Disclosure) 2.
Inspection Summary (Not Exempt) bcc w/ Inspection Summary:
State of South Carolina bcc w/ encl:
Document Management Branch Chief of Safeguards Branch, DSRSI Chief, MC&A, Licensing Branch, NMSS bcc w/o encl.
l License Fee Management Branch RII RII RII RII; DbMhes EhP%ne AFGi sn GL p
5/S /82 5/s /82 5/O /82 5/$/82 l
$IYdfg3 o ti o 11 l
g
-