OPERATING DATA REPORT DOCKET NO. 50 - 277 i
DATE BAY 10, 1982 C05PLETED BY PHILADELPHI A ELECTRIC COMPANY N.H.ALDEN EN GIN EER-IN -CH AR G E NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPER ATING ST ATUS
- 1. UNIT NABE: PEACH BOTTOM UNIT 2 l NOTES: UNIT 2 IS DOWN FOR l
g i
- 2. REPORTING PERIOD:
APRIL, 1982 l
REFUELING AND HAINTENANCE.
l
..___________==-- ----- _-_
g g
- 3. LICENSED THERMAL POWER (MWT) :
3293 l
STARTUP SCHEDULED FOR l
g g
=.___..
- 4. NAMEPLATE RATING (GROSS MUE) :
1152 l
JUNE 4, 1982 I
g g
- 5. DESIGN ELECTRICAL RATING (NET WE) :
1065 l
l i
l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS BWE): 1098 l
l g
l
- 7. HAIIn05 DEPENDABLE CAPACITY (NET RWE) :
1051 l
l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEBS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) :
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS HONTH IR-TO-DATE CUBULATIVE
- 11. HOURS IN REPORTING PERIOD 719 2,879 68,567
_____=-
- 12. NUMBER OF H00BS REACT 01 WAS CRITICAL 0
1,182.0 50,925.4
- 13. REACTOR RESERVE SHUTDOWN B00BS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE
..=--
0.0 1,167.1 49,623.6
____ =_
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
=-
=. _.___.___
- 16. GROSS THERHAL ENERGY GENERATED (MWH) 0 3,143,292 144,366,608
- 17. GROSS ELECTRICAL ENERGY GENERATED (59H) 0 1,009,650 47,513,420
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
-4,056 961,361 45,552,096
- 19. UNIT SERVICE FACTOR 0.0 40.5 72.4
- 20. UNIT AVAILABILITY FACTOR 0.0 40.5 12.4
____.=
=
- 21. UNIT CAPACITY FACTOR (OSING EDC NET) 0.0 31.8 63.2
- 22. UNIT CAPACITY FACTOR (USING DER. NET) -
0.0 31.4 62.4
- 23. UNIT FORCED OUTAGE RATE 0.0 2.7 8.0
- 24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REFDELING/5 AINTEN ANCE, ST ARTED 2/20/82, FOURTEEN NEEKS 820517 @ %
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIM ATED DATE OF STARTUP:
64 82
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPER ATION) :
FORECAST ACHIEVED 1
l INITIAL CRITICALITY INITIAL ELECTRICITY C055ERCI AL OPERATION 0
- NEGATIVE VALDE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY COMBISSION REPORTS.
OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE MAY 10, 1982
-- =-
COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPER ATING ST ATUS
'-==~
__... __=-- - _=_ _=_
=___...
- 1. UNIT NAME: PEACH DOTTOM UNIT 3 l NOTES: UNIT 3 CONTINDED l
g l
- 2. REPORTING PERIOD:
APRIL, 1982 l
OUTAGE FROM PREVIOUS l
l l
- 3. LICENSED THERMAL POWER (MWT) :
3293 l
MONTH.
l l
l 4 NAMEPLATE RATING (GROSS MWE) :
1152 l
1 l
l S. DESIGN ELECTRICAL RATING (NET MWE) :
1065 l
l l
l
- 6. M AXIMUM DEPEND &BLE CAPACITY (GROSS MWE): 1098 l
t l
l
- 7. M AXIM0M DEPENDABLE CAPACITY (NET MWE) :
1035 l
l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) :
- 10. REASONS FOR RESTRICT ONS, IF ANY:
THI3 MONTH YB-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719 2,879 64,463
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 537.1 2,608.4 48,095.8
-=
- 13. REACTOR RESERVE SHUTDOWN HODRS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 512.5 2,562.1 46,788.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
=
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,607,798 8,197,449 134,888,971
- 17. CHOSS ELECTRICAL ENERGY GENERATED (MWH) 538,920 2,761,480 44,150,400
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 520,979 2,676,397 42,386,870
- 19. UNIT SERVICE FACTOR 71.3 89.0 72.6
- =_
- 20. UNIT AVAILABILITY FACTOR 71.3 89.0 72.6
_ = - _
- 21. UNIT CAPACITY FACTOR (OSING MDC NET) 70.0 89.8 63.5
=_____ - ___
- 22. UNIT CAPACITY FACTOR (USING DER NET) 68.0 87.3 61.7
- 23. UNIT FORCED OUTAGE R ATE 28.7 11.0 8 1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TY PE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIM ATED DATE OF STARTUP:
- 26. DNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) :
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 t
DATE MAY 10, 1982 t
COMPANY PHILADELPHIA ELECTRIC COMPANY
.C W.M.ALDEN E NGINEER-IN-CH A RG E NUCLEAR SECTION
! O
"""""*TI " "I'I"I "-""CL*^^
TELEPHONE (215) 841-5022
(
MONTH APRIL 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAuE DAILY POWER LEVE:
j (M W E-N ET)
(MWE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
.)
7 0
23 0
l-8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
g 13 0
29 0
C 14 0
30 0
15 0
16 0
t L
L
AVSitAGE dally' UNIT POWER LEVEL DOCKET No. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE MAY 10, 1982 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH APRIL 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M WE-NET)
(M WE-NET) 1 0
17 1077 2
0 18 1076 3
0 19 1076 4
0 20 1076 5
0 21 1078 6
0 22 1077 7
0 23 1075 8
0 24 1075 9
55 25 1075 10 537 26 1073 11 811 27 1073 12 1048 28 1072 13 1072 29 1073 14 1079 30 1074 15 1076 16 1075 6
e
~
~~'
e m
r UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH DOTTOM UNIT 2 DATE HAY 10, 1982 REPORT HONTH APRIL, 1982 COBPLETED BY PHILADELPHIA ELECTRIC COMPANY
==
es N.H.ALDEN ENGINEER-IN-CHARGE
' UCLEAR SECTION J
GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 l
l l
l l NETHOD OF l LICENSEE lSYSTE5l COMPONENT l CAUSE AND CORRECTIVE l
l TYPE l DURATION l REASON l SHUTTING DOWNl EVENT l CODE l CODE l ACTION TO 7,
30.l DATE I (1) l (HOURS) {
(2) l REACTOR (3) l REPORT 4 l
(4) l (5) l PREVENT RECURRENCE I
i l
l 1
1 I
I I
3l 820401 l S l 719.0 l
C l 1
l NA l BC l FUELII l CONTINUING REFUELING OUTAGE.
f l
l 1 ----- 1 I
I I
l 1
l l
l 719.0 l
l l
l l
l p
A/
(1)
(2)
(3)
(4)
F - FORCED REASON METHOD EIHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA D#
B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING J - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EIPLAIN)
FILE (NUREG-0161)
N E - OPERATOR TRAINING + LICENSE EIARINATION F - ADMINISTRATIVE (5)
G - OPER ATION AL ERROR (EIPLAIN) b*
H - OTHER(EIPLAIN)
EIHIBIT I - SAME SOURCE v
O 3
3
M UNIT SHUTDONNS AND PONER REDUCTIONS DOCKET NO. 50 - 278
.--- _ _ = = _ _ _ _. _ _
UNIT NAME PEACH BOTTOM UNIT 3 D4TE MAY 10, 1982 REPORT MONTH APRIL, 1982 COMPLETED BT PHILADELPHIA ELECTRIC COMPANY U.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
=
==--
z._ ____== __
l l
1 l
l METHOD OF I LICENSEE l SYSTEM l COMPONENT l CAUSE AND CORRECTIVE l
lTYPEIDURATIONl REASON l SHUTTING DONNI EVENT l CODE l CODE I ACTION TO E D. l DATE l (1)l (HOURS)I (2) l REACTOR (3) l REPORT 8 l
(4) I (5) i PREVENT RECURREMCE
=
==-- -
I I
I I
I I
i 1
1 7 I 820401 i Fl 206.5 l A l 1
i NA l HA l GENERA l CONTINUING MAINTENANCE SHUTDOWN PROMPTED BY I
l l
l l
l l
l l YIBRATION OF THE MAIN GENERATOR EICITER.
I I
I I
I I
I I
I I
I I ----- 1 I
I I
I I
l l
l 206.5 I l
l l
l l
(1)
(2)
(3)
(4)
F - FIRCED REASON METHOD EINIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EIPLAIN)
FILE (NUR EG-0161)
E - OPERATOR TRAINING + LICENSE EIAMINATION F - ADMINISTR ATIVE (5)
G - OPER ATION AL ERROR (EIPLAIN)
H - OTHER (EIPLAIN)
EIRIBIT I - SAME SOURCE m
W
1>ocket No. 50-277 Attachasnt to Monthly Operating Report For April 1982 REFUELING DTFORMATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdowns refueling began February 20, 1982 3
Scheduled date for restart following refueling June 4, 1982
- 4. Will refueling or zesumption of operation thereafter require a tenknie=1 specification charyge or other license amendment?
Yes.
If answer is yes, what,'in general, will these be?
Technian' Specifications to accommodate reload b l.
Modifications to reactor oore operating limits are expected.
- 5. Schedulea date(s) for submitting proposed licensing action and supporting infozzation:
February 24, 1982 4
6.
Important licensing considerations associaf,ed with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None expected.
7 The number of fuel assemblies (a) in the core and (b) in the spent.
fuel storage pool (a) Core - 764 h 1 Assemblies (b) Puel Pool-117.0 Puel Assemblies Thep$santlicensedspentfuelpool'atoragecapacityandthesize
~
8.
l of any inoroase in licensed' storage capacity that has been requested or is planned, in number of fuel assemblies:
'4 The spent fuel pool stcrage capacity has been relicensed for 2816 h1 assemblies.
- 9. The projected date of the 1 sat refueling that can be discharged to the spent h 1 pool assuning the present licensed capacity.
I September,1990 j
1 l
Docket No. 50-278 Attachm:nt to i
Monthly Operating Report For April, 1982
}
REFUELDIG INWRMATION 4
1.
Name of facility:
i Peach Bottom Unit 3 i
I 2.
Scheduled date for next refueling shutdowns i
Feb.
12, 1983 l
3 Scheduled date for restart following refueling:
l l
April 8, 1983 1
1 14 Will refueling or resumption of operation thereafter require a j
techniaal specification change or other license amendment?
i Yes.
If answer is yes, what, in general, will these be?
i Technical specification changes to accommodate reload fuel.
Modifications to reactor core operating limits are expected.
5 Scheduled date(s) for submitting proposed licensing action and supporting information:
4 1
j December 17, 1982 1
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unroviewed design or
{
perfomanne analysis methods, significant changes in fuel design, i
new operating procedures Bone expected.
j.
7 The number of 61 assemblies (a) in the core and (b) in the spent i
fuel storage pools i
(a) Core - 7 % Fuel Assemblies
]
(b) Fuel Pool - 928 In*Ai-ted Fuel Assemblies 8.
The present licensed spent fuel pool storage capacity and the size
{
of any increase in licensed storage capacity that has been requested l
or is planned, in number of fusl assemblies:
i The spent fuel pool storage capacity has been relicensed i
for 2816 fuel assemblies.
9 The projected date of the last refueling that can be discharged to-j :
the spent fuel pool assuming the present licensed capacity:
September,1991
PEACH BOTTOM ATOMIC POWER STATION NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES April, 1982 UNIT 2 The unit remains shut down to accommodate refueling, major modifications and maintenance work.
The Torus mechanical work is complete; the Reactor Water Cleanup suction piping in the Drywell has been replaced; and the Reactor Water Cleanup System has been chemically decontaminated to reduce the radiation levels during heat exchanger maintenance.
The examination of the main turbine low pressure rotors is complete and the 261 damaged 7th stage bucket pins have been replaced.
Modification work to the Scram Discharge Volume is continuirg.
Startup is scheduled for June 4, 1982.
UNIT 3 The unit began the month shut down as a result of high generator exciter vibration on March 30, 1982.
The major work completed durins the outage included replacement of the 3A Reactor Recirculation pump scal, investigation of the main turbine generator exciter vibration problem, repair of an EHC fluid leak on a main turbine Combined Intercept valve, repairs to two Reactor Water Cleanup isolation valves and repair of two Icaking feedwater heaters.
The unit was returned to service on April 9.
On April 17, the #1 transformer (3 Start up feed) was removed from service for routine maintenance.
It was returned to service on April 23.
The unit ended the month at full power.