@t GN

'

.

JAN 0 61982

Georgia Power Company

ATTN: Mr. J. H. Miller, Jr.

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

Subject: Report Nos.bl/81

and 50-366/81-32

This refers to the routine safety inspection conducted by Mr. L. A. Franklin of

this office on December 14-18, 1981, of activities authorized by NRC Operating

License No. DPR-57 and License No. NPF-5 for the E. I. Hatch facility. Our pre-

liminary findings were discussed with Mr. M. Manry, plant manager, at the_

conclusion of the inspection.

.

Areas examined during the inspection and our findings are discussed in the-

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you' have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

i

8205140561 820507

PDRADOCK05000g

G

,

.

,

.

,

.

Georgia Power Co.

2

JAN 0 61992

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

,

Sincerely,

N

Paul _J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

i

Enclosure:

,

Appendix A, Notice of Violation

cc w/ encl:

J. T. Beckham, Vice President and

General Manager-Nuclear Generation

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

bcc w/ enc 1:

Document Management Branch

State of Georgia

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary