Forwards IE Insp Rept 50-389/82-07 on 820216-19 & Notice of Violation
ML20051B876
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/26/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20051B743 List:
References
NUDOCS 8205140526
Download: ML20051B876 (2)


See also: IR 05000389/1982007

Text

,

gdbd

'

'

.

.

V

MAR 2 61982

Florida Power and Light Company

ATTN:

Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject:

Report No. 50-389/82-07

This refers to the routine safety inspection conducted by Mr. B. R. Crowley of

this office on February 16-19, 1982, of activities authorized by NRC Construc-

tion Permit No. CPPR-144 for the St. Lucie facility.

Our preliminary findings

were discussed with Mr. B. J. Escue, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are di , cussed in the

enclosed inspection report.

Within these areas, the inspection ccasisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are l i stec' in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

One new unresolved item is identified in the eficlosed inspection report. This

item will be examined during subsequent inspections.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you noti 'y this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the 01fice of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

g5140526820429

O

ADOCK 05000389

PDR

J

r

-

.

.

.

.

.

.

.

Florida Power and Light

2

MM 2 61982

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-389/82-07

cc w/ enc 1:

B. J. Escue, Plant Manager

N. Weems, Assistant GA

Construction Manager

-

bcc w/ encl:

Documert Management Branch

State of Florida

NRC Resident Inspector

$Y-B fr.!L0

"" 09

"" $

"'

ARHprdt