ML20051B259

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-389/82-10 on 820309-12 & Notice of Violation
ML20051B259
Person / Time
Site: Saint Lucie 
Issue date: 03/30/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20051B040 List:
References
NUDOCS 8205140508
Download: ML20051B259 (2)


See also: IR 05000389/1982010

Text

y.

-

. -

-

. . -

..

- --

.

- -.

. . -

'

[d

,

.

l

MAR 3 0 E

Florida Power and Light Company

ATTN:

Dr. R. E. Uhrig Vice President

s

Advanced Systems and Technology

,

-

i

P. O. Box 529100

,

Miami, FL 33152

L

I

Gentlemen:'

Subject:

Report No. 50-389/82-10

This refers to the routine safety inspection conducted by Mr. A. B. Ruff of

,

this office on March 9-12, 1982, of activities authorized by NRC Construction

4

Permit No. CPPR-144 for the St. Lucie 2 facility.

Our_ preliminary findings

were discussed with Mr. B. J. Escue, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

-

~

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

'

During the inspection, it was. found that certain activities under your license

i

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclose:1 herewith as Appen-

j-

dix A.

Elements to be included in your response are delineated in- Appendix A.

l

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

l

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

!

cation to withhold information contained therein within thirty days of the date

j

of this letter.

Such application must be consistent with the requirements of

l-

2.790(b)(1).

l

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

!

Should you have any questions concerning this letter, we will be glad to discuss

'

them with you.

Sincerely,

,

1

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

,

'

Enclosures:

See Page 2

i

,

l=

8205140508 820429

PDR ADOCK 05000389

'

G

PDR

- . _ _ - . _ ,

.

.

...

.. ..

-

. ~

.

.

. .

,.

.

.

M30M

Florida Power and Light Company

2

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-389/82-10

cc w/ enc 1:

B. J. Escue, Plant Manager

N. Weems, Assistant QA

Construction Manager

bcc w/ enc 1:

Document Management Branch

State of Florida

NRC Resident Inspector

i

RII

RII

RII

RII

R

,

!

ABR

es

TC

In

ARH dt

KD

i

aivi82

,ai82

,

i82

ag82

29 ,82

l