Forwards IE Insp Rept 50-395/82-24 on 820323-26.No Noncompliance Noted
ML20051A164
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/19/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20051A195 List:
References
NUDOCS 8205140480
Download: ML20051A164 (2)


See also: IR 05000395/1982024

Text

!

o

e

APR 191982

m

Y

o>

South Carolina Electric and Gas Company

ATTN:

Mr. T. C. Nichols, Jr. , Vice President

S

C

Power Production and System Operations

IIECENED

P. O. Box 764

g7

hyyI3

u

uram., 8 2x

Columbia, SC 29218

--

m a.% w g:e

Gentlemen:

"J

roc

p

Subject:

Report No. 50-395/82-24

Cu

/

This refers to the routine safety inspection conducted by Mr. E. H. Girard of

this office on March 23-26, 1982, of activities authorized ' y NRC Construction

r

Permit No. CPPR-94 for the V. C. Summer facility and to the discussion of our

findings held with Mr. W. A. Williams, General Manager of Nuclear Operations,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items '

discussed in the enclosed

.

inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this of fice, by

telephone, within ten days of the date of this let.ter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerr.ing this letter, we will be gird to discuss

them with you.

Sincerely,

ne e.

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

8205140400 820419

PDR ADOCK 05000395

G

PDR

g

.

.

South Carolina Electric and

2

APR 191982

Gas Company

Enclosure:

Inspection Report No. 50-395/82-24

cc w/ encl:

J. B. Knotts, Jr.

O. S. Bradham, Station Manager

J. P. Harrison, Manager Nuclear

Security

C. A. Price, Manager, Nuclear

Engineering

A. A. Smith, Site QA Coordinator

bcc w/ encl:

NRC Resident Inspector

Document Management E5 ranch

State of South Carolina

r

'

' #,

RII

RIbeg

RII

RI

j /

h

JU'

[WV

FJ ong [g

EHGirard:ht

ARHgrdt

JRogge

4//f/82

4/p/82

4/ /82

4/g/82