ML20050Q312

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-259/81-37,50-260/81-37 & 50-296/81-37 on 811126-1225 & Notice of Violation
ML20050Q312
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/21/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20050P422 List:
References
NUDOCS 8204140478
Download: ML20050Q312 (2)


See also: IR 05000259/1981037

Text

,

-

.o

.

CYO0

'

-

.

JAN 2 ) 1932

Tennessee Valley Authority

ATTil: fir. H. G. Parris

Manager of Power

500A Chestnut Street Tower 11

Chattanooga, Til 37401

Gen tlemen:

Report lios, h1 3[)S0-260/81-37, and 50-296/81-37

Subject:

This refers to the routine safety inspection conducted by fir. R. F. Sullivan of

this office on flovember 26 - December 25, 1981, of activities authorized by itRC

Operating License llos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry facility.

Our preliminary findings were discussed with f tr. G. T. Jones, Plant

Superintendent, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

Within these areas, the inspection consisted of

enclosed inspection report.

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate flRC requirenents.

This item and references to pertinent

requirements are listed in the flotice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

These

Two new unresolved items are identified in the enclosed inspection report.

itens will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a cnpy si this letter and the enclosures will

be placed in the flRC's Public Document Roon unless you notify this of fice, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

!

date of this letter.

Such application must be consistent with the requirements

,

of 2.790(b)(1).

The responses directed by this letter and the enclosures are riot subject to the

clearance procedures of the Office of 11ariagement and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

1

8204140478 82031805000259

PDR ADOCK

PDR

G

}

.

__.

-

- _ - ..

- _ - .

. - -

-.

. -,

.

-

,

'

-

.

.

-

-

.

l

JAN 211982

Tennessee Valley Authority

2

1

1

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

i

i

Enclosures:

1.

Appendix A, Notice of Violation

,

j

2.

Inspection Report Nos. 50-259/81-37

i

50-260/81-37 and 50-296/81-37

cc w/ encl:

>

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

.

H. N. Culver, Chief, Nuclear Safety

Review Staff

i

bec w/ encl:

)

NRC Resident Inspector

Document flaragement Branch

'

i

State of Alabama

,

1

.

I

l

!

!

I

i

i

i

.

i

7

'

RII

RII

RII

RI

,

R

her

a

11

RC

wis

pdCase:dt

1/19/82

1//9/82

1//(/82

1/gy82

i

!

,

-

. , , , - , --

. . ,

,m

,

~

-.--..-,,,n

---,n.

--- - , - -

-

-n-,

- . . - , . - - - - - . , , ,

-