Forwards IE Insp Repts 50-335/82-08 & 50-389/82-08 on 820223.No Noncompliance Noted
ML20050N702
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/24/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20050N703 List:
References
NUDOCS 8204140428
Download: ML20050N702 (2)


See also: IR 05000335/1982008

Text

0FFICIAL COPY

,.

,

Max L' 4 N82

D

@\\

Florida Power and Light Company

sf

g'

ATTN: Dr. R. E. Uhrig, Vice President

f/

.f

-

Advanced Systems and Technology

y

44

/

O g;p; f2

P. O. Box 529100

?

Miami, FL 33152

h!

-

V

'

'

AlC.

^

'

\\';

.

,

l

Gentlemen:

\\^x

"

Report NQ35/82-Dnd 50-389/82-08

yX(,, % [

'

Subject:

-

This refers to the routine safety inspection conducted by Mr. P. A. Taylor of

this office on February 23, 1982, of activities authorized by NRC Operating

License No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie

facility and to the discussion of our findings held with Mr. C. M. Wethy, Plant

Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

f3

o

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure: (See Page 2)

8204140428 820324

PDR ADOCK 05000335

G

PDR

Sfol:/;

-

.

.

,

,

MAR 2 4 IN2

Florida Power and Light Company

2

'

Enclosure:

Inspection Report Nos. 50-335/82-08

and 50-389/82-08

cc w/ enc 1:

C. M. Wethy, Plant Manager

N. Weems, Assistant CA

Construction Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

'/

KLa (I s

JPS hr

PTaylor:ejw

GR@nkins

J9fffe

Pfsfff

FJLong

3/J3/82