Forwards IE Insp Repts 50-250/82-12 & 50-251/82-12 on 820224-26.No Noncompliance Noted
ML20050N535
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/18/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20050N536 List:
References
NUDOCS 8204140390
Download: ML20050N535 (2)


See also: IR 05000250/1982012

Text

ca

.

.

2 1b 1"82

/

x

-

',

Florida Power and Light Company

O

' -

ATTN:

Dr. R. E. Uhrig Vice President

c/

%

'

5 "2 ' kf

Advanced Systems and Technology

i

.r e

'

P. O. Box 529100

,c1

' o L-

cd') '

9 fp

Miami, FL 33152

,,,.

',

O C. Q

/Q

Gentlemen:

Subject:

Report No

0/82-lhd50-251/82-12

This refers to the routine safety inspection conducted by Mr. W. P. Ang of this

office on February 24-26, 1982, of activities authorized by NRC Operating License

Nos. DPR-31 and DPR-41 for the Turkey Point facility and to the discussion of our

findings held with Mr. T. Roberts of your staff, at the conclusion of the inspec-

tion.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

Three new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2. 790(b)( 1) .

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

<

5

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

8204140390 820318

PDR ADOCK 05000250

S6cl s

"

"""

.

.

.

.

Florida Power and Light Company

2

MAR 18 1982

_

Enclosure:

Inspection Report Nos. 50-250/82-12

and 50-251/82-12

cc w/ encl:

H. E. Yaeger, Site Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

RII

RI

RII

R

WPAng:ht

ARHerdt

K

FJLon

3/ s/82

3/g]/82

3/

82

3// /82