Forwards IE Insp Repts 50-250/82-10 & 50-251/82-10 on 820224.No Noncompliance Noted
ML20050N511
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/24/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20050N517 List:
References
NUDOCS 8204140376
Download: ML20050N511 (2)


See also: IR 05000250/1982010

Text

/.

OFFICIAL COPY

l

l

th i 41982

o>

d?

4

\\

Florida Power and Light Company

fy

49

g

ATTNi Dr. R. E. Uhrig, Vice President

'/

-? ?/

p

'gh

l

Advanced Systems and Technology

2/

"

'-

o

i

P. O. Box 529100

9j

/g) j%p

_

32

'

Miami, FL 33152

LA

-

p

\\\\

. " 4'

i

Gentlemen:

,N ' D

I

'

a\\9T,I,h

Subject: Report No

50/82-

d 50-251/82-10

l-

This refers to the routine safety inspection conducted by Mr. P. A. Taylor of

i

this office on February 24, 1982, of activities authorized by NRC Operating

License Nos. OPR-31 and DPR-41 for the Turkey Point facility and to _the

discussion of our findings held with Mr. D. W. Haase, Operations Superintendent,

-

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

!

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

'

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10'CFR 2.790(a), a copy of this letter and the enclosure will

!

be placed in the NRC's Public Document Room unless you. notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

,

date of this letter. Such application must be consistent with the requirements

j

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

S

.

F. J. Long, Acting Chief

Reactor Projects Branch 2

,

l

Division of Project and

'

i

Resident Programs

i

'

Enclosure: (See Page 2)

l

'

8204140376 820324

PDR ADOCK 05000250

'""

!

ffoi:/l-

1

/

O

.

t/.AR L 4 02

Florida Power and Light Company

2

Enclosure:

Inspection Report Nos. 50-250/82-10

and 50-251/82-10

cc w/ enc 1:

H. E. Yaeger, Site Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

i

t

1

'

I

'

l

RII

/d'

RIIgfl[

RII /

-

RII

RII'

n

Kla' dis

JPSt

ir

l

PTaylor:ejw

GRJenk ns

Jfkym

HD%

FJL ng

3/'L982

3/ 9/82

3/jp'82

34(/82

3/p 182

i