Forwards IE Insp Repts 50-250/82-05 & 50-251/82-05 on 820216-19.No Noncompliance Noted
ML20050N502
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/15/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20050N503 List:
References
NUDOCS 8204140371
Download: ML20050N502 (2)


See also: IR 05000250/1982005

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Ja

. . . <.

.

l

l

l

MAR 151982

Florida Power and Light Company

ATTN: Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject: Report Nos. 50-250/82-05; 50-251/82-05

This refers to the routine safety inspection conducted by Mr. J. R. Wray of this

office on February 16-19, 1982, of activities authorized by NRC Operating License

Nos. DPR-31 and DPR-41 for the Turkey Point facility and to the discussion of our

findings held with Mr. J. K. Hays, Plant Manager-Nuclear, at the conclusion of

the inspection.

Aread examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this of fice, by

,

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

g\\M

j

VA

^1

, ' 4 {4

,

y

-

,

2

H

F. J. Long, Acting Chief

gb'

- ,

q

Reactor Projects Branch 2

e

..

t

Division of Project and

k

/

Resident Programs

A

/

('

/

Enclosure (See Page 2)

8204140371 820313

PDR ADOCK 05000250

G

PDR

SGd:/l

'

"

'

MAR 151982

-

Florida Power and Light Co.

2

Enclosure:

Inspection Report Nos. 50-250/82-05,

50-251/82-05

cc w/ encl:

H. E. Yaeger, Site Manager

bcc w/ encl:

Document Management Branch

State of Florida

o

RII

RII

RII

RII

RII

'

,

Ahr

h

es

KP

r

b~n

KDL

FJ

76 82

3/t L/82

3 01/ 2

J//l/82

g//k82

/