ML20050N502
| ML20050N502 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/15/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20050N503 | List: |
| References | |
| NUDOCS 8204140371 | |
| Download: ML20050N502 (2) | |
See also: IR 05000250/1982005
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Ja
. . . <.
.
l
l
l
MAR 151982
Florida Power and Light Company
ATTN: Dr. R. E. Uhrig, Vice President
Advanced Systems and Technology
P. O. Box 529100
Miami, FL 33152
Gentlemen:
Subject: Report Nos. 50-250/82-05; 50-251/82-05
This refers to the routine safety inspection conducted by Mr. J. R. Wray of this
office on February 16-19, 1982, of activities authorized by NRC Operating License
Nos. DPR-31 and DPR-41 for the Turkey Point facility and to the discussion of our
findings held with Mr. J. K. Hays, Plant Manager-Nuclear, at the conclusion of
the inspection.
Aread examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this of fice, by
,
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
g\\M
j
^1
, ' 4 {4
,
y
-
,
2
H
F. J. Long, Acting Chief
gb'
- ,
q
Reactor Projects Branch 2
e
..
t
Division of Project and
k
/
Resident Programs
A
/
('
/
Enclosure (See Page 2)
8204140371 820313
PDR ADOCK 05000250
G
SGd:/l
'
"
'
MAR 151982
-
Florida Power and Light Co.
2
Enclosure:
Inspection Report Nos. 50-250/82-05,
50-251/82-05
cc w/ encl:
H. E. Yaeger, Site Manager
bcc w/ encl:
Document Management Branch
State of Florida
o
RII
RII
RII
RII
RII
'
,
Ahr
h
- es
KP
r
b~n
KDL
FJ
76 82
3/t L/82
3 01/ 2
J//l/82
g//k82
/