ML20050M124

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-454/82-02 on 820125-29,0202-03 & 16-14 & Notice of Violation
ML20050M124
Person / Time
Site: Byron Constellation icon.png
Issue date: 03/30/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20050M169 List:
References
NUDOCS 8204140301
Download: ML20050M124 (2)


See also: IR 05000454/1982002

Text

,

WAR 3 0 G82

[$

Docket No. 50-454(DETP)

s'

Vf

G 0

k

Np

-9

Commonwealth Edison Company

-f

ATfN:

Mr. Cordell Reed

-,d

'"

~

'

Vice President

S

~

hGh

8

Post Office Box 767

Chicago, IL 60690

A"&

//

Gentlemen.

IT ;G

This refers to the routine safety inspection conducted by Mr. M. A. Ring of

this office on January 25, 26, 27, 29 and February 2, 3, 16-19, 1982, of

activities at Byron Nuclear Power Station, Unit 1, authorized by NRC Con-

struction Permit No. CPPR-130 and to the discussion of our findings with

Mr. R. Querdo and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews 91th personnel.

During this inspection, certain of your activities appeared to be in noncom-

!

pliance with NRC requirements, as specified in the enclosed Appendix. A

written response, submitted under oath or affirmation, is required. With

regard to Item 2 of Appendix A, we found that the station's controls for

the care and preservation of safety 'olated equipment have not been effective.

,

l

Further, this item is repetitive, sir ce similar items of noncompliance were

identified during previous NRC inspections in 1981 and earlier in 1982.

In

'

your response to this item, please indicate why your proposed corrective

action is expected to be more successful in preventing future similar viola-

tion than the corrective action specified previously.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five (25) days from

the date of this letter a written application to this office to withhold such

I

information.

If your receipt of this letter has been delayed such that less

than seven (7) days are available for your review, please notify this office

l

l

l

i

8204140301 820330

1

PDR ADOCK 05000454

G

PDR

l

I Eol

,

l

'M

_

_

>

.

m

MAR 3 01382

' Commonwealth Edison Company

2

promptly so that a new due date may be established. Consistent with Section

2.790(b)(1), any such application must be accompanied by an affidavit executed

by the owner of the information which identifies the document or part sought

to.be withheld, and which contains a full statement of the reasons which are

the bases for the claim that the information should be withheld from public

,

s. disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

i

.

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

$

.specified periods noted above, a copy of this letter, the enclosures, and your

response to this letter will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

.

Sincerely,

ICInd :imod L.7 c,;, yjgeygugg

'

C. E. Norelius, Director

Division of Engineering and

Technical Programs

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-454/82-02(DETP)

cc w/encls

Louis 0. De1 George, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Station

x

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

,

Resident Inspector, RIII

Braidwood

Mary Jo Murray, Office of

Assistant Attorney General

'

Myron M. Cherry

l

I

I

n

RIII

RIII_

RI

I /

RII

RIII

f

QMX

.'

NWT

.s

Ring /jp

ck w

t1e

Hayes

us

3/glys

3/8/82

3

?.-

. - .

..

.

-. .- .

_ - - -

-

-

-, -_