Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212C1121999-09-16016 September 1999 Criticality Safety Analysis of W Spent Fuel Storage Racks in Pool B of Crystal River Unit 3 ML20212C0961999-09-16016 September 1999 Proposed ITS & Bases Changes Strikeout & Shadowed Text & Revision Bar Format,Increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revising Configuration for Storage of Fresh Fuel ML20211L1011999-09-0202 September 1999 Proposed Tech Specs Re Once Though SG Tube Surveillance Program,Alternate Repair Criteria (ARC) for Axial Tube End Crack (Tec) Indications ML20212C0991999-08-31031 August 1999 Criticality Safety Analysis of Crystal River Unit 3 Pool a for Storage of 5% Enriched Mark B-11 Fuel in Checkerboard Arrangement with Water Holes ML20209D2971999-07-0808 July 1999 Proposed Tech Specs,Changing ITS for CREVS & VFTP & Correcting Typo in ITS Section 5.6.2.12 ML20195B8091999-05-26026 May 1999 Proposed Tech Specs,Revising ITS Bases That Will Update NRC Copies of ITS ML20195B7081999-05-17017 May 1999 Proposed ITS Section 3.3.8, EDG Lops, SR 3.3.8.1,revising Note for Surveillance & Deleting Note for Frequency ML20206S7691999-05-12012 May 1999 Proposed Improved Tech Specs Pages 3.4-21 Through 3.4-21D ML20206N1401999-05-10010 May 1999 Proposed ITS Administrative Controls Section 5.8, High Radiation Area ML20206M0961999-05-0707 May 1999 Proposed Tech Specs,Revising Wording for SR 3.5.2.5 to Be More Consistent with NUREG-1430,Rev 1 & Clarifying Process of Valve Position Verification ML20206H6541999-05-0505 May 1999 Proposed Tech Specs,Proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of CR-3 OTSGs ML20204D9211999-03-18018 March 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Tube Repair Roll Process ML20205A7651999-03-18018 March 1999 Rev 29 to AR-305, Es E Annunciator Response ML20205A7961999-03-15015 March 1999 Rev 22 to AR-301, ESA Annunciator Response ML20205A8051999-03-15015 March 1999 Rev 33 to AR-303, ESC Annunciator Response ML20205A8211999-03-15015 March 1999 Rev 35 to AR-403, PSA H Annunciator Response ML20205A3441999-03-12012 March 1999 Rev 25 to AR-402, PSA G Annunciator Response ML20204D5781999-03-0909 March 1999 Rev 10 to AP-513, Toxic Gas ML20204D5821999-03-0808 March 1999 Rev 22 to AR-603, Tgf O Annunciator Response ML20207H7741999-03-0303 March 1999 Rev 15 to AR-602, Tgf N Annunciator Response ML20207J6591999-03-0202 March 1999 Rev 18 to AR-504, ICS L Annunciator Response ML20207J6461999-03-0202 March 1999 Rev 21 to AR-301, ESA Annunciator Response ML20206S7561999-02-28028 February 1999 Rev 2 to Pressure/Temp Limits Rept, Dtd Feb 1999 ML20203C7461999-02-0303 February 1999 Rev 2 to AR-801, FSA Annunciator Response ML20202E6551999-01-27027 January 1999 Proposed Tech Specs Re OTSG Tubes Surveillance Program,Insp Interval Extension ML20202B1411999-01-22022 January 1999 Rev 22 to AR-401, PSA F Annunciator Response ML20199G5201999-01-15015 January 1999 Rev 11 to AP-961, Earthquake ML20199G5581999-01-12012 January 1999 Rev 4 to AP-404, Loss of Decay Heat Removal ML20199G5691999-01-12012 January 1999 Rev 4 to AP-604, Waterbox Tube Failure ML20198T2411999-01-0606 January 1999 Rev 19 to AR-701, Ssf P Annunciator Response ML20196G6771998-12-0101 December 1998 Rev 17 to Annunciator Response AR-702, Ssf Q Annunciator Response ML20196D6761998-11-30030 November 1998 Proposed Tech Specs LCO 3.9.3,allowing Both Doors in Personnel Air Locks & Single Door in Oeh to Be Open During Refueling Operations ML20196G5851998-11-25025 November 1998 Rev 32 to AR-303, ESC Annunciator Response ML20196G3371998-11-25025 November 1998 Reissued Rev 15 to AR-702, Ssf Q Annunciator Response ML20195K4551998-11-24024 November 1998 Proposed Tech Specs,Installing diesel-driven EFW Pump to Remove Interim ITS & Provide Resolution to EDG Capacity Limitations ML20196F6691998-11-24024 November 1998 Rev 11 to AP-330, Loss of Nuclear Svc Cooling ML20195K0031998-11-23023 November 1998 Proposed Tech Specs Re LAR Number 241,rev 0 for High Pressure Injection Sys Mods ML20196F7721998-11-23023 November 1998 Rev 3 to EOP-12, Station Blackout ML20196F7031998-11-23023 November 1998 Rev 3 to AP-404, Loss of Decay Heat Removal ML20196F7541998-11-23023 November 1998 Rev 7 to EOP-08, LOCA Cooldown ML20196F7461998-11-23023 November 1998 Rev 6 to EOP-07, Inadequate Core Cooling ML20196F7241998-11-23023 November 1998 Rev 2 to AP-510, Rapid Power Reduction ML20196F7161998-11-23023 November 1998 Rev 9 to AP-470, Loss of Instrument Air ML20196F8711998-11-23023 November 1998 Rev 28 to AR-305, Es E Annunciator Response ML20196F9451998-11-19019 November 1998 Rev 7 to AP-1080, Refueling Canal Level Lowering ML20196F9381998-11-19019 November 1998 Rev 27 to AP-770, Emergency Diesel Generator Actuation ML20195H6581998-11-17017 November 1998 Proposed Improved Tech Specs (Its),Revising 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic ML20196D8321998-11-13013 November 1998 Rev 1 to Crystal River Unit 3 ASME Section Xi,Isi Program Interval 3 & Ten Yr NDE Program ML20195H8761998-11-0505 November 1998 Rev 23 to AR-302, Esb Annunciator Response ML20155F4021998-10-30030 October 1998 Proposed Revised Improved Tech Specs (ITS) Section 5.6.2.19, ITS Section 3.4.11,Bases 3.4.11 & 3.4.3 Re PTLR & LTOP Limits 1999-09-02
[Table view] Category:TEST REPORT
MONTHYEARML20212C1121999-09-16016 September 1999 Criticality Safety Analysis of W Spent Fuel Storage Racks in Pool B of Crystal River Unit 3 ML20212C0991999-08-31031 August 1999 Criticality Safety Analysis of Crystal River Unit 3 Pool a for Storage of 5% Enriched Mark B-11 Fuel in Checkerboard Arrangement with Water Holes ML20206S7561999-02-28028 February 1999 Rev 2 to Pressure/Temp Limits Rept, Dtd Feb 1999 ML20155F9771998-10-20020 October 1998 Rev 1 to Holtec Rept HI-982056, Reanalysis of Crystal River Pool B Spent Fuel Storage Racks with Boraflex Degradation ML20141F6821997-04-0808 April 1997 Hydraulic Evaluation by Ingersoll-Dresser Pump Co for Fl Power Corp Crystal River 3 Plant ML20135A8001996-08-19019 August 1996 Rept on Raceway Fire Barriers for Aluminum Cable Tray & Aluminum Wireway Sys 3F0796-25, Thermal-Lag & Mecatiss Ampacity Test Investigation of Raceway Fire Barriers for Conduit & Cable Tray Sys1996-05-0707 May 1996 Thermal-Lag & Mecatiss Ampacity Test Investigation of Raceway Fire Barriers for Conduit & Cable Tray Sys ML20117M9181996-02-28028 February 1996 Books 1-6 of Underwriters Labs Test Repts for FPC for Feb 1996 ML20211D1611994-09-13013 September 1994 Results of 2000 Hour Test at 385 Bhp/Cyl on 38TD8-1/8 OP Engine,Rept R-5.08-0236 ML20211D1521994-01-25025 January 1994 200 Hour Rating Qualification Test Rept ML20092C1771991-11-0707 November 1991 Reactor Containment Bldg Integrated Leakage Rate Test Rept 3F0990-07, Cycle 8 Startup Rept1990-09-30030 September 1990 Cycle 8 Startup Rept 3F0588-02, Cycle 7 Startup Rept1988-04-30030 April 1988 Cycle 7 Startup Rept ML20150E0701987-11-30030 November 1987 Reactor Containment Bldg Integrated Leak Rate Test ML20093N1611984-07-31031 July 1984 Once-Through Integral Sys Hot Leg High Point Vent Test 240100 ML20093N1681984-07-31031 July 1984 Once-Through Integral Sys Hot Leg High Point Vent Test 240200 ML20078H2301983-07-31031 July 1983 Reactor Containment Bldg Integrated Leak Rate Test, Jul 1983 ML20050K5431982-04-0808 April 1982 Local Leak Rate Test Rept, Pages 6,9 & 10 ML20041F5401982-03-31031 March 1982 Cycle 4 Startup Rept,Mar 1982. ML20049H7971982-02-19019 February 1982 Local Leak Rate Test Rept. ML17268A1041981-05-31031 May 1981 B&W Post-Test Evaluation of Loft Test L3-1. ML20010A3351980-12-31031 December 1980 Exam & Test of Crystal River 3 Power-Operated Relief & Safety Valves. ML19340B5291980-10-31031 October 1980 Cycle 3 Startup Rept. ML19339B1311980-09-26026 September 1980 Local Leak Rate Test Rept. ML19339B1281980-09-0303 September 1980 Reactor Containment Bldg Integrated Leak Rate Test. ML19250B5921979-10-18018 October 1979 Cycle 2 Startup Rept. ML19253B3901979-09-20020 September 1979 Local Leak Rate Test Rept ML19317H0311979-05-10010 May 1979 Test Rept for Seismic Qualification Testing of Potential Transformer Model JVM4 & Current Transformer Model JCM4. ML19261B3591979-01-30030 January 1979 Cycle 1:Mid-Cycle Startup Rept. ML19308D6931977-07-27027 July 1977 Startup Rept ML19263C0731977-06-0909 June 1977 Fire Retardant Cable Test,June-Sept 1977,R&D Project. ML19308D7011976-12-0909 December 1976 Reactor Containment Bldg Preoperational Integrated Leak Rate Test. ML19308D6861976-12-0707 December 1976 Reactor Containment Bldg Structural Integrity Test. ML19326B2451976-11-0404 November 1976 Structural Integrity Test Preliminary Rept 1999-09-16
[Table view] |