ML20050J225
| ML20050J225 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 04/08/1982 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| References | |
| NUDOCS 8204140175 | |
| Download: ML20050J225 (2) | |
Text
,
E!{:.';l1CORY APR 8 1982 l
D-Docket No. 50-483 S
j$
CJ y @.CP g f' Union Electric Company g
pgg Gn g" q Y dh J
ATTN Mr. Donald F. Schnell a
Vice President - Nuclear
.#fp7 h
Post Office Box 149 - Hail Code 400 C,
- .69 @
/ /-
/'
K,, 4
St. Louis, MO 63166 af r'
Centlement During the next few weeks this office will be performing special team assessments of the construction programs at selected nuclear power plants under construction in Region III, including your Callaway Nuclear Power Plant. The purpose of this special effort is to determine if there are indications of existing or potential construction problems similar to some of those identified at a number of other plants under construction.
The assessment team will be composed of a Region III Section Chief as team leader, the Senior Resident Inspector, and three or four technical specialists. The onsite phase of the assessments is expected to be approximately two weeks in duration.
The scope of the assessments will include quality assurance program inter-faces and overviews, corrective actions systems, design change control, material traceability of installed structures and components, electrical cable installation, inprocess inspections, and effectiveness of quality control inspectors. In assessing these areas, the team say identify areas of weakness or examples of poor practice in addition to any identified items of noncompliance. You will be expected to respond to all substantive findings identified in the assessment report.
Each plant to be assessed will be notified by this office in advance of the arrival of the assessment team. The specific date of arrival will be provided at that time. In addition, specific information will be requested from you in advance of the team arrival date to allow proper team preparation and better utilization of the team's time at the site.
It vould be helpful if you designate a person to be responsible for assestbling the advance information we request and act as a liaison with the team in that regard.
DMB :
8204140175 820408 PDR ADOCK 05000483
/
hO G
,L
. Nk.. p krd...Ab.
. 9.
2
- hr.
'hf15s.. k le h/p.r..
a W2_l y-l gp w /82
.l.
OFFICIAL RECbRD COPY
( NRC FORM 318 (10 80) NRC 0240
~
!^
APR 81982 Union Electric Company You are requested to provide full cooperation to the assessment team. As part of that cooperation, team members should be permitted unfettered access to the facility, and authorizations should be provided for the use of cameras onsite.
We appreciate your cooperation. If you have any questions concerning this matter please contact Mr. W. S. Little of this office.
Sincerely, Original signed by I
Mate's S. Il/pfe"r Regional Administrator cc:
W. H. Weber, Hanager, Nuclear Construction DMB/ Document Control Deck (RIDS)
Resident Inspector, RIII Region IV K. Drey Ronald Fluegge, Utility Division Missouri Public Service Connission
\\
OF F IC E )
suanaun)
DATEf wac e osu m oc oor ssc" cido OFFICIAL RECORD COPY
" " " -3 *2