ML20050H018
| ML20050H018 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 03/18/1982 |
| From: | Cantrell F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML20050H019 | List: |
| References | |
| NUDOCS 8204140131 | |
| Download: ML20050H018 (2) | |
See also: IR 05000416/1982010
Text
r
o
y(//N
r-
r
/
P'a 13 1982
Mississippi Power and Light Company
O
(-
ATTN:
Mr
N. L. Stampley
<
Vice President of Production
d,
P. O. Box 1640
9
-C
C
,
Jackson, MS 39205
2
.g p y
'
ro !1 u
c
-
Q T,..,,,grpJ']. .,3[8
--
c.Q
g
Gentlemen:
'y
Subject:
Report No. 50-416/82-10
qA
N
/ '%g .
inspection conducted by Mr. ' cH'.bf ,8
'
i
This refers to the routine safety
ard of
this office on February 8-12, 1982, of activities authorized by NRC Construction
Permit No. CPPR-ll8 for the Grand Gulf facility and to the discussion of our
findings held with Mr. G. B.
Rogers, Site Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspe. tion, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
N
l
F. Cantrell, Acting Chief
l
Reactor Projects Branch 1
Division of Project and
Resident Programs
l
Enclosure (See Page 2)
!
8204140131 820318
PDR ADOCK 05000416
G
l
,
/
r
r
,
,
.
O
'
Mississippi Power and Light Co.
2
Enclosure:
Inspection Report No. 50-416/82-10
cc w/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bec w/ encl:
Document Management Branch
State of Mississippi
NRC Resident Inspector
RII
RI
(
RII
RII
T *.6
W/$
h6
EHGirard:es
ARHerdt
RCButcher
3 FSCantrell
3 //7/82
f/;1/82
/,1/82
,}
Z/jg'/82
-