OPERATING DATA REPORT

~

50-409 DOCKET NO.

DATE _03_-04-81 COMPLE1 ED BY.L.S.CCOD?GN TELEPr0NE 608-689-_2331 OPERATING STATUS Notes la Crosse Boiling Water Reactor

1. Unit Name:
2. Reporting Period: 0001. 02-01-81 TO 2400. 02-28-81
3. Licensed Thennal Power (MWt):

165 65.3

4. Nameplate Rating (Gross MWe):

50

5. Design Electrical Rating (Net MWe):

0

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Level To Which Restricted if Any(Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr.-to-Date Cumulative 672 1416 99.315 i1. Ilours In Reporting Period

12. Number Of flours Reacto Was Critical 667.9 788.7 64,885.7
13. Reactor Reserve Shutdown liours 0

0 478

14. Ilours Generator On-Line 642.?

642.2 59,673.5

15. Unit Resene Shutdown flours 0

0 79

16. Gross Thermal Energy Generated (MWii) 82.125.6 82,665.1 8,167.002.5
17. Gross Electrical Energy Generated (MWH) 23,578

_ _ _ _, _, 23,578 2,454,213 22,024 21,430 2.268.710

18. Net Electrical Energy Generated (MWH) 95.6 45.4 60.1
19. Unit Sen-ice Factor 95.6 45.4 60.2
20. Unit Availability Factor 65.6 30.3 45.7
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 68.3 31.5 47.6
23. Unit Forced Outage Rate 2.8 2.8 7.1 l
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

Funl Roenint. May 1, 1981, 2 Weeks I

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIA L ELECT RICITY CO\\tMERCI A L OPER ATION 1

8204130394 8103 yDRADOCK05000

("6'l 9

PDR j

\\

9 AVERAGE DAILY UNIT POWER LEVEL 50- M DOCKET NO.

LACBWR UNIT DATE COMPLETED By L.S.G00DPAN 608-689-2331 TELEPilONE MONTII EEBRUARY 1981 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Net)

O 0

39 i

37 9

39 2

18 18 19 39 3

4 21 20 39 5

26 21 39 20 39 6

22 39 7

23 s

33 39 24 9

33 39 25 to 34 26 39 35 11 27 39 12 37 39

,3 38 13 29 la 38 3o is 38 3

16 39

- INsixUcTIONs On this format. fist the aserage daily unit power levelin MWe Net for each day in the reporting month. Compute to the ncarest whole megawait.

(9/77)

NARRATIVE

SUMMARY

OF OPERATING EXPFRIFNCE FEBRUARY 1981 At the onset of the February 1981 reporting period, the reactor was at 21% Rated Thermal Power during power escalation at the end of the refueling outage.

At 1112 on February 1, 1981, the turbine-generator was synchronized to the DPC electrical grid, but at 1119, the generator was removed from the grid, as a precautionary r.easure, since the internal spring pin for oil Circuit Breaker 25NB1, which connects the generator to the DPC grid, was broken when the switch was closed.

During the preparation for repair of the switch, an incorrect 69 KV disconnect switch was opened, which interrupted the off-site 69 KV power supply to the reserve auxiliary transformer, causing an automatic reactor shutdown at 1134.

The reactor was returned to critical at 1543 on February 1 and escalation commenced.

At 0159 on February 2, the turbine-generator was synchronized to the DPC grid.

At 0455 the generator was removed from the DPC grid as a precaution due to turbine governor hydraulic control system response problems.

The plant was resynchronized to the grid at 0715, but additional un:bbae governor control system response problems led to the generator being disconnected from the grid at 1708 on February 2 for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 15 minutes and on February 4 at 0330 for 23 minutes.

System response improved with continued operation.

The reactor was not shut down during these turbine generator outages.

Power escalation continued until February 14, when 85% Reactor Rated Thermal Power (38 MWe-Net) was achieved.

This power level has been scheduled to extend the time period between refueling outages.

Power generation continued at this rate throughout the remainder of the February reporting period.

Significant maintenance items perforred during the February 1981 reporting period are indicated on the attached Instrument and Electrical Maintenance and Mechanical Maintenance listings.

I l

l

Page 1 of 2 UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.

50-409 UNIT N AME _LACBWR DATE 03-05-61 REPORT MONTil FEBRUARY 1981 COMPLETED By L.S. GOODMAN TELEPHONE 608-689-2331 We 3?

3 kY Licensec

,E g Cause & Correctne No.

Date y

3g 4

jg5 Event 7

e-1 Action to yE E

j5g Report n (E U H

]'

Prevent Recurrence 6

80-12 80-11-09 S

11.2 C

2 NA NA NA CONTINUATION OF REFUELING OUTAGE 81-01 81-02-01 F

14.7 G

3 81-02 EA CKTBRK GENERATOR WAS REMOVED FROM DPC GRID AS A PRECAUTION SINCE THE INTERNAL SPRING PIN OF THE CON

  • TROL SWITCH FOR OIL CIRCUIT BREAKER 25NB1, WHICH CONNECTS THE GENERATOR TO THE DPC GRID, WAS BROKEN WHEN THE SWITCH WAS CLOSED.

DURING THE PREPARATION FOR REPAIR OF THE SWITCH, AN INCORRECT DISCONNECT SWITCH WAS OPENED, WHICH DISCONNECTED THE PLANT FROM THE RESERVE AUXIL-IARY TRANSFORMER, CAUSING AN AUTOMATIC REACTOR SHUTDOWN.

THE EMERGENCY DIESEL GENERATORS y

y

....(Copt'd next page)

F: Forced Reason:

Method:

Exhibit G -Instructions l

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Prepaution of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensec C Refueling 3 Automatic Scram.

Event Report (LE RI File t NURI.G-D-Regulatory Restriction 4 Other (Explain) 0161)

E-Operator Training & Liceme Examination F-Administrative 5

G-Operational Er ror (Explain!

Ihlubit I - Same Source 19/77) 11-01her (Explain) if

~

Page 2 of 2 UNIT SliU1D0%NS AND POWER REDUCTIONS DOCKET NO.

50-AD9 UNIT NA%f E 05-81 DATE REPORT MONTil FEBRUARY 1981 COMPLETED BY

-L.S. GOODMAN TELEPHONE 608-689-2331

~.

5?

3 k$

Licensec

,Eg Cause & Correctne No.

Date y

g 4

,g g 5 Event g

Q Action to f5 E

jGg Report a mV H

j' Prevent Recurrente 6

81-01 SUPPLIED PLANT LOADS. ADDITION-(Cont 'd)

AL SWITCHYARD TRAINING WILL BE PROVIDED TO THE OPFRATORS.

81-02 81-02-02 F

2.3 H

4 NA HA MECFUN DURING OUTAGES 81-02, 81-03 AND 81-03 81-02-02 F

1.2 H

4 NA HA MECFUN 81-04, THE GENERATOR WAS TEMPOR-81-04 81-02-04 F

0.4 H

4 NA HA MECFUN

'ARILY REMOVED FPOM THE DPC GRIDI AS A PRECAUTION DUE TO TURBINE GOVERNOR HYDRAULIC CONTROL SYSTEM RESPONSE PROBLEMS.

SYSTEM RESPONSE IMPROVED WITH CONTINUED OPERATION AFTER THE

~

COLD SHUTDOWN FOR REFUELING.

THE REACTOR WAS NOT SHUTDOWN DURING THESE OUTAGES.

I 2

3 4

F. Forced Reason:

Method:

Exinbit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for preparainin of Data B Maintenance of Test 2 Manual Seeain.

Entr> Sheets for lxensec C Refueling 3-Automatic Scram.

Event Report (t I R) File (Nt'RI G.

D Regulatory Restriction 4 Olher (Explain) 01611 E-Operator Training & l.icense Examination F Administrative 5

G. Operational E:ror (Explain)

Estubit I - Same Sourse

('7/77)

II Other (Explain)

FEBRUARY 1981 l

INSTRUMENT AND ELECTRICAL MAINTENANCE Pg. 1 of 2 LER OR l

flATURE OF OUTAGE

[tA_LFUtiCTI0ft j

EQUIPMEllT MAINTENAf4CE NUMBER CAUSE RESULT CORRECTIVE ACTI0ft SECURITY SYSTEM CORRECTIVE NA USAGE BROKEN WIRE RECONNEdTED WIRING INTERCOM MR 0414 AND TESTED SECURITY SYSTEM CARD CORRECTIVE NA UNKNOWN TESTED SATIS-NO MALFUNCTION READER MR 0400 FACTORY SECURITY SYSTEM CORRECTIVE NA UNKNOWN ALARMING READJUSTED MICRO-MICROWAVE 20-6 MR 0449 WAVE 20-6 SECURITY SYSTEM CORRECTIVE NA COLD WEATHER DOOR STUCK DOOR FROZEN STACK DOOR MR 0450 MR 0235 SECURITY SYSTEM CORRECTIVE NA UNKNOWN ALARM ADJUSTED BALANCE E-FIELD MR 0438 MR 0455 SECURITY SYSTEM CORRECTIVE NA UNKNOWN ALARM ADJUSTED BALANCE MICROWAVE 20-2 MR 0353 MR 0454 SECURITY SYSTEM CORRECTIVE NA UNKNOWN ALARM ADJUSTED BALANCE MICROWAVE 20-3, 4,

6 MR 0398 SECURITY SYSTEM CORRECTIVE NA EXTRA GROUND INSTALLED GROUND INSTALLED GROUND WIRE COMPUTER MR 0461 REQUIRED GENERATOR TEMPERATURE CORRECTIVE NA USAGE INCORRECT READ-CLEANED SLIDE WIRE RECORDER MR 0424 ING FIRE DETECTION SYSTEM PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED FIRE SYSTEM TESTS NUCLEAR INSTRUMENT PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED TECH. SPEC.

CH N-5 THRU N-9 TESTS N5 - N-9 NUCLEAR INSTRUMENT CORRECTIVE NA DRIFT LOW READING ADJUSTED METER TRIM CH N-6 MR 0428

FEBRUARY 1981 INSTRUMENT AND ELECTRICAL MAINTENANCE Pg. 2 of 2 LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION NUCLEAR INSTRUMENT PREVENTIVE NA TEST DUE COMPLETED TEST COMPLE'I'ED TECH. SPED.

CH N-1 TEST CH 1 NUCLEAR INSTRUMENT CORRECTIVE NA UNKNOWN LOW READING ADJUSTED AGS CONTROL CH N-8 MR 0446 POINTS MR 0460 RADIATION MONITORING CORRECTIVE NA USAGE NO PAPER DRIVE ADJUSTED MOTOR CLUTCH MR 0436 FOR STACK MONITOR RADIATION MONITORING CORRECTIVE NA UNKNOWN INOPERATIVE REPLACED CHASSIS TUNNEL MONITOR MR 0445 WITH SPARE SAFETY SYSTEM CH 1, 2

PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED TECH. SPEC.

AND H O #3 TESTS FOR SAFETY SYSTFM 2

1, 2 AND WATER LEVEL

  1. 3 COuTROL ROD DRIVE #16 CORRECTIVE NA USAGE LAMP DIM AND REPLACED SECONDARY SECONDARY POSITION MR 0463 FLICKERING POSITION INDICATING Ii4DICATION LAMP FOR CRD #16 COMMUNICATIONS SYSTEM CORRECTIVE NA REPLACEMENT REPLACED PHONE REPLACED TUNNEL MR 0423 DUE TELEPHONE MR 0437 CONTROL SWITCH FOR CORRECTIVE NA EXCESSIVE FORCE INTERNAL SPRING REPLACFD SWITCH OCB 25NB1 MR 0421 USED TO CLOSE PIN BROKEN FACEPLATE SWITCH

FFBRUARY 1981 PG. 1 of 2 11ECIIA!!ICAT, MAINTENAt:cI:

IEP Op

~~

fit:TURE Of 01!IAGF f4Al.f UriCT10f1 EQUIPMEllT MAlfiT EllAf;CE fair'CER CAUSE RESULT CORRECTI\\'E ACT10'4 EMERGENCY WATER PREVENTIVE NA NRC COMMITMENT BACKUP WATFR NA SYSTEM FC 83-80-1 SUPPLY FROM MR 0267 RIVER lA SEAL INJECTION CORRECTIVE NA AGED GASKET EXCESSIVE WATER REMOVED OLD GASKET PUMP MR 0418 LEAK AND INSTALLED ALL NEW GASKETS CONTAINMENT BUILDING PREVENTIVE NA NRC COMMITMENT RADIATION RF-SFAL SUBSTITUTION INLET VENT DAMPERS FC 73-80-2 SISTANT E.P.R.

MR 0251 TYPE SEALS FNVIRONMENTALLY AND SEISMICALLY QUALIFIED BY BFTTIS CORP.

RECIRCULATION VENT PREVENTIVE NA NRC COMMITMENT RADIATION PF-SFAL SUBSTITUTION DAMPER FC 73-80-2 SISTANT F.P.R.

MR 0251 TYPE SEALS ENVIRONMENTALLY AND SEISMICALLY QUALIFIFD BY BETTIS CORP.

LUBE OIL PURIFIER CORRECTIVE NA UPPER BEARING CAUSED BELT TO '

MR 0426 SEIZFD SLIP AND OVFR-CO?'PLFTF PPPLACEMENT CF IIEAT l UPPFR AND LOWER BFAP-INGS AND CI!ECKFD ALL OTIIFR PARTS FOR WFAP 1A DIESEL GENERATOR PREVENTIVE NA NRC COMMITMFNT ANCIIORED TO NA MR 0431 FLOOR FOR SEISMIC CONTROL NO. 4 DEEP WELL CORRECTIVE NA BOLTS FRAC-TOTALIZER COVER REPLACED WITil STAINLFSS MR 0441 TURED CAME OFF CAUS-STEEL STUDS IJG FgCESS WAT-

[

FEBRUARY 1981 PG. 2 Of 2 ng., gnuIcAT MAIMTruAtM'M i f.c (w f1ATURE Of oli1 Ar,i MAI FUl!CT I0fl E0VIPMEf1T t'AItilEriArict riittml R CAUSE RESULT CORRECTIV.E ACTION _ _ _ _ _ _ _ _,

1B WASTE WATER PUMP CORRFCTIVE NA NOPMAL FXCFSE WATER COMPLETE OVERHAUL MR 0329 WPAR LFAK CONTAINMENT SAMPLING PREVENTIVE NA TMI REQUIRE-NA POST ACCIDENT SYSTEM FC 71-80-1 MENT ANALYSIS SYSTFM l

MR 0171 INSTALIATION l

WASTE WATER FLOW CORRECTIVE NA PLUGGED UP WOULD NOT READ NFW MFTEP TO PP,EVFNT i

METER FC 54-80-2 OUT PLUGGIFG MR 0451 l

d b

-