ML20050E697

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-460/82-02 & 50-513/82-02 on 820201-28 & 820223.No Noncompliance Noted
ML20050E697
Person / Time
Site: Washington Public Power Supply System
Issue date: 03/26/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20050E714 List:
References
NUDOCS 8204130332
Download: ML20050E697 (2)


See also: IR 05000460/1982002

Text

,

___ _ _ .

-


- - - - - - - -

- - - - -

a

v.

.,m m

w

.y.

-.

I

3

3

sg

g

g

(

{

c.

l

l

MAR 2 61982

M

9-

Docket Nos. 50-460,50-513(CON)

p

c

Ac b

i

$c 0

p

d i:2

6

-

Washington Public Power Supply System

7

6 N !?

g^! y ,0 ~,'.

0

) i

P. O. Box 968

3

of g

/ p/

Richland, Washington 99352

,.

"

Attention: Mr. D. W. liazur

h

.

Program Director

C5

ds'

Gentlemen:

Subject: NRC Inspection

This refers to the inspection conducted by Mr. A. D. Toth of this

office, during February 1-28, 1982 of activities authorized by NRC

Construction Pemit Nos. CPPR-134 and CPPR-174 and to the discussion

of findings held by Mr. Toth with you, Mr. C. Edwards and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information contained

therein within thirty days of the date of this letter.

Such application

must be consistent with the requirements of 2.790(b)(1).

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

.au

' . L T:

..

R

/ Eol

r204130332 820326

.s

PDR ADOCK 05000460

T. W. Bishop, Acting Chief

0

PDR

Reactor Construction Projects Branch

//

@

_

.. Run

eg

-m >

...m.Y. . pgDS. .. .

BISH

....p..

. . ..

. . ..

..

..

.. .

... .... .. .....

.. .. ... ..

-+

...

,,, , ,,,

, ,, ,,

, ,,

,

,,,

,,

, ,,, ,, ,,,,, ,

, .., . . .. .. .

M

...wM.82...

3pH82

0'! . . . . . .

.. .

. ... ..

.

.

.. . ... ..

.. ..... ...

...

. . . ...

...............i

om m uo comucu eno

OFFICIAL RECORD COPY

' " * #"2'

__

_ . - .

t

.

R 2 61982

11ashington Public Power Supply System

-2-

Enclosure:

IE Inspection Report

No. 50-460/82-02

flo. 50-513/82-02

cc w/o enclosure:

R. B. Glasscock Quality Assurance Director

t-

icc:

Of1B/ Document Control Desk (RIDS)

l

Distributed by RV:

State of t/A (Lewis)

Resident Inspector (2)

Encelken

,

_