ML20050E697
| ML20050E697 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 03/26/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20050E714 | List: |
| References | |
| NUDOCS 8204130332 | |
| Download: ML20050E697 (2) | |
See also: IR 05000460/1982002
Text
,
___ _ _ .
-
- - - - - - - -
- - - - -
a
v.
.,m m
w
.y.
-.
I
3
3
sg
g
g
(
{
c.
l
l
MAR 2 61982
M
9-
Docket Nos. 50-460,50-513(CON)
p
c
Ac b
i
$c 0
p
d i:2
6
-
Washington Public Power Supply System
7
6 N !?
g^! y ,0 ~,'.
0
) i
P. O. Box 968
3
of g
/ p/
Richland, Washington 99352
,.
"
Attention: Mr. D. W. liazur
h
.
Program Director
C5
ds'
Gentlemen:
Subject: NRC Inspection
This refers to the inspection conducted by Mr. A. D. Toth of this
office, during February 1-28, 1982 of activities authorized by NRC
Construction Pemit Nos. CPPR-134 and CPPR-174 and to the discussion
of findings held by Mr. Toth with you, Mr. C. Edwards and other
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and submit written application to withhold information contained
therein within thirty days of the date of this letter.
Such application
must be consistent with the requirements of 2.790(b)(1).
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
.au
' . L T:
..
R
/ Eol
r204130332 820326
.s
PDR ADOCK 05000460
T. W. Bishop, Acting Chief
0
Reactor Construction Projects Branch
//
@
_
.. Run
eg
-m >
...m.Y. . pgDS. .. .
BISH
....p..
. . ..
. . ..
..
..
.. .
... .... .. .....
.. .. ... ..
-+
...
,,, , ,,,
, ,, ,,
, ,,
,
,,,
,,
, ,,, ,, ,,,,, ,
, .., . . .. .. .
M
...wM.82...
3pH82
0'! . . . . . .
.. .
. ... ..
.
.
.. . ... ..
.. ..... ...
...
. . . ...
...............i
om m uo comucu eno
OFFICIAL RECORD COPY
' " * #"2'
__
_ . - .
t
.
R 2 61982
11ashington Public Power Supply System
-2-
Enclosure:
IE Inspection Report
No. 50-460/82-02
flo. 50-513/82-02
cc w/o enclosure:
R. B. Glasscock Quality Assurance Director
t-
icc:
Of1B/ Document Control Desk (RIDS)
l
Distributed by RV:
State of t/A (Lewis)
Resident Inspector (2)
Encelken
,