Public Version of Revision 1 to Emergency Plan Implementing Procedures HNP-4624 Re Site Area Emergency - Internal Survey Team & HNP-4724 Re General Emergency - Internal Survey Team
ML20050E134
Person / Time
Site: Hatch  
Issue date: 03/23/1982
From: Rogers W
GEORGIA POWER CO.
To:
Shared Package
ML20050E132 List:
References
PROC-820323-01, NUDOCS 8204130063
Download: ML20050E134 (6)


Text

..-.. _.

.',.. s GEORGIA POWER COMPANY HATCH NUCLEAR PLANT PROCECURE Internal Survey Team Site Area Fmorooncv PR5CEcuRE TITLE HNP-4624 PROCEOURE Nur.3ER D-)

tnh RESPONSIBLE SECTIGN SAFETY RELATED ( X )

NON-SAFETY RELATED (

)

APPROVED APPROVED REV.

DESCRIPTION DEPT.

PLANT DATE HEAD MAN #3FR

--l-_-_

1 Page 2 g

_ _. J3 ___

.N

's z.:

__i

,I

'7 d

f r204130063 8204o1

)(0 0

- HNP-9~

PDR ADOCK 05000321 g

F PDR I'.

MANUAL.SE?

.n.

%,.um muom o E. l. HATCH NUCLEAR PLANT HNP-4624 Gee Title Paga m,.,0,,, o 1

Ge6roia Power d um

~~

Gee Ti,e.Pege O

1 of 2 SITF AREA EMPRCFNCY - INTERNA!. SURVFY TFAM NOTE This procedure superrehesHNP-4603 Revision 4 dated 1-2-81.

A.

CONOTTION Events are in process or have occurred which involve actual or likely major failures of plant functions needed for protection of the public.

Any releases are not expected to ex ceed PAG expc sure levels, except near the site boundary.

G.

REFFPFNCFS HNP-4620.

C.

ACTTnN NOTE This action is to be taken by the Health Physics Supervi=.or or designated alternate, whenever possible, or by other trained personnel.

1.

Obtain the following equipment from the Emergency Kit or from the HP Office:

High Range Survey Meter High Range Dosimeter GM Survey Instrument and Wipes MSA A.tr Park SCRA Protective Clothing Air Sampler 2.

Turn instriments on and allow them to warm up.

3.

Don the protective cloth.ing and +he SCBA.* Proceed toward area whern the emergency exists making survey as you go.

a.

If any of the following readings are observed retreat 3

immediately and notify the Control Room Geta, Gamma - any reading above 5 R/hr Contaminatini. - 10,000 cpm above background on a wipe 4.

Take sainp l e s with an atr sampler if conditions permit.

m 5 7 = &.,=,

  • rw

.-- J q g 4

h s gh a c tiv i ty and not i f y, l'o,ntt ol f o or% y S.

De term ine cause of

..M.

s.;:.4 11 ~.'s g A. -* 1 -* 7 9j q

'Mr i.2 h MANUAL SE

j s

O N OL PEULLOUM NO E. l. HATCH NUCLEAR PLANT HNP-4E24

~

See Title Page

% ium uu um 1

See Title P.,ge 1 of 2 6.

Rope off and post areas of hign air activity or radiation as conditions permit.

7.

. Determine habitability of health physi.c,s, laboratory and counting room areas.

Report to Control Room.

NOTE The primary means of communication wi'h the control room, ECF and TSC will be through the use of the plants telephone system.

If this system should become inoperable, then the page will act as the backup means of communication.

8.

Assist Control Room personnel when requested in evaluating the e:. tent of radioactive material released or potential for releane, using eff)uent monitor readings or other air samplers readily availab]e, meterological instrumentation, and procedures HNP-4350 and HNP-4851 to estimate dose rates to persons beyond the p] ant site boundary.

9.

Notify Shift Foreman if conditions exist that would cause a person at or beyond the plant site boundary to receive radiation exposure at General Emergency levels or action levels in HNP-4851.

10.

Communicate with the Emergency Operations Facility and/or Technical Support Center in determining extent of the activity release.

11.

Document survey findings on standard health physics survey forms; report findings and present completed survey forms to H.P.

Supervision for approval ano Filing.

12.

Return to the O.S.C when released by the Shift Foreman or H.P.

Supervisor.

L, G :.n :'.,.,

[9d ).h.,..;s..

3 D' g

a-

%:a :

-s MANUAL SET

~~

. s t.,

-t

^

GEORGIA POWER COMPANY HATCH NUCLEAR FLANT t

PROCFDURE Genaral Em a r _o._n n_ _c.v - internal Surve~v Team PROCEDURE TITLE HNP-4724

^

' PROCEDURE NUMBER Ogerations RESPONSIRLE SECTION SAFETY RELATED ( X )

NON-SAFETY RELATED (

)

APPROVED APPROVED REV.

DESCRIPTION DEPT.

PLANT DATE HEAD mat ' - GER 1

Page 2 y

3 y_

gj 3g

___s I

\\

m, - --> -

m 3 3

-2 c.

.. _t

_s..

.;.:: 2 tm

,N.N9-9

  • 4 m

l

  • 4 A MANUAL.SEl

i

,.i. -

,* m vvat mwvat No E. l. HATCH NUCLEAR PLANT w"9-c7a4

(,g)

<c ~ ~

e.,..

r m,, n,. -

DAlt e

i Georgia Power a

~~

m.n riAle o n e..:

1 04 P GENERAL EM RGFNCY - T NTERNAt. PURVEY TEAM NOTE This procedure supercedes HNP-4703 Rev: 4 dated 5-13-78.

A.

CONDITION Events are in process or have occurred which involve actual or imminent sut.stantial core degradation or mel'.ing with potent.i.a) for loss of containment integrity.

Relea e can be reasonably expected to exceed PAG exposure levels offsite for more than the immediate site area.

B.

REFERENCE HNP-4720 NOTE This action is to be taken by the H.P.

Supervisor, and technicians whenever possible, or by other tra:inad personnel.

1.

Obtain the following equipment from the emergency kit or from the HP Office:

High Range Survey Meter High Range Dosimeter GM Survey Instrument and Wipas MSA Air Pa-ck SCCA Protective Clothing Air Sampler 2.

Turn instruments on and allow them to warm up.

3.

Don the protective clothing and the SCBA.

Proceed toward area where the emergency exists making a

survey as you go.

a.

If any of the following readings are

observed, retteat immediatelf and not.1fy the control room:

Geta, Gamma - any read.ing abova S R/hr.

Contsmtnation - 10,000 cpm above background on a wipe.

s,ayy

v. -:

_ =,. J J b[

)

1.

~!

[

s'

- J m ' MANUAL.

.^

.. ue m ou.m E.1. HATCH NUCLEAR PLANT HNP-4724 Suo Title Page m.:uou um 1

See Tit 1= PASG 2 of 2 4.

Take samples with an air sampler if condi ti ons pe rrt..i t.

of high activity an<i notify control room.

5.

Determine cause 6.

Rope'off and post areas of high air activity or radiation as conditions permit.

7.

Determine habitability of Health Ph9 sics, Laboratory, and 1

Counting Room areas.

Report to Control Room.

NOTF The primary means of communication with the control room, EOF and TSC wall be through the use of the plants telephone system.

If this system should become inoperable, then the page will be the backup means of communication, 8.

Assist Control Room personnel, when requested, in evaluating the extent of radsonctive material released or potential for release itsing eff)uent monitor readings or other air samplers readily available, treterological instrumentation, and procedures HNP-4350 and HNP-ASF1 to estimate dose rates to persons at and beyond the plant site boundary.

9.

Notify Shift Foraman if conditions exist that would cause a

person at or beyond the plant site boundary to receive radiation exposure at General Emergency levels or at action levels in HNP-4351.

10.

Communication with the Emergancy Operations Facility and/or Technica)

Support Center in determining extent of the activity release.

11.

Document survey findings on standard health physics survey forms; prnent Findings and present survey forms to H.P.

Supervision for approval and filing.

12.

Return to the O.S.C.

when release by the Shift Foreman

..r H.P.

Supervisor.

., -, g p,,-

  • . ) \\.

,m