4 Washington Public Power Supply System 4
Box 1223 Elma, Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 April 1, 1982 G03-82-320 U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention:
Mr. T. W. Bishop Chief, Reactor Construction Projects Branch
Subject:
PROJECT NOS. 3 AND 5 INTERIM REPORT OF POTENTIAL 10CFR50.55(e)
RT INDICATIONS ON SAFETY INJECTION TANKS AND REACTOR PUMP SUPPORTS (D/N #023)
Reference:
Letter, G03-82-085, dated January 27, 1982, R. S.
Leddick to B. H. Faulkenberfy, same subject.
The referenced letter forwarded an interim report of the subject condi-tion and noted that the next interim report would be provided to your office by April 1, 1982.
Interpretation of radiographic indications found in three weld areas (two in Safety Injection Tank #1 and one in Tank #2) has not been re-
]
solved.
In an effort to provide a resolution, Combustion Engineering (CE) has agreed to furnish documentation that will justify their inter-pretation.
A final report for the subject condition will be forwarded to your office upon receipt and evaluation of CE's interpretation.
It is anticipated that this action will be completed by May 1982. Accord-ingly, the final report will be submitted by May 31, 1982.
Should you have any questions or desire further information, please contact me directly.
fc R. S. Leddick, 760 Program Director, WNP-3 DRC/tt cc:
J. Adams - NESCO D. Smithpeter - BPA Ebasco - New York WNP-3/5 Files - Richland 8204120288 820405 PDR ADOCK 05000508 S
. - -