ML20050D462

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-482/82-03 on 820126-29 & 0217-19. No Noncompliance Noted
ML20050D462
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/31/1982
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Koester G
KANSAS GAS & ELECTRIC CO.
Shared Package
ML20050D463 List:
References
NUDOCS 8204120229
Download: ML20050D462 (2)


See also: IR 05000482/1982003

Text

,i

,,

g* i M " " '

Docket:

STN 50-482/82-03

f-

/}J.10 U/3

/

'

/

['

9

  • ' '

Kansas Gas and Electric Company

[l

,,.nSgt

--.

ATTN:

Mr. Glenn L. Koester

b }ypg

-

i

g. g

'

Vice President - Nuclear

(

C, d.9

.

P. O. Box 208

\\

C

s

s

Wichita, Kansas 67201

&

s

'Q /'; 3 _I N

N "l

Gentlemen:

This refers to the inspection conducted by Mr. R. C. Stewart of our staff

during the period January 26-29 and February 17-19, 1982, of activities

authorized by NRC Construction Permit CPPR-147 for Wolf Creek, Unit 1, and to

the discussion of our findings with Mr. D. W. Prigel and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspeciton, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

RPSA/';

RPSAW

RPSC O

RPB18

RPB2

DRRP&EP,5

E

R/

JGagliardoKSeyYr[itJCb11 ins

RStewart/dsm

TWesterman RHall

GMadsen

WSeiole

3/23/82

3/:S/82

3/.a /82 3/r,U/82

3/4 /b3

3ff /82

3/)l/82 3/)U82

8204120229 820331

-

PDR ADOCK 05000482

J (W

-

G

PDR

r

p

N

-

.

.~

.

,

Kansas Gas and Electric Company

2

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

n=,{

j

W.

> idle, Chief

Re ctor Project Branch 2

Enclosure:

Appendix - NRC Inspection Report STN 50-458/82-03

bcc to DMB (IE01)

bcc distrib. by RIV:

BC

R. Stewart

PM

T. Vandel

AE00

T. Westerman

ELD

R. Hall

IE FILE

TPB

IE/RPRIB

RPB2

NRR/DHFS

INFO SYSTEMS

NRR/0LB

J. Collins

.

RAD ASMT BR

Kansas State Health Dept.

RESEARCH

Myron Karman, ELD, MNBB (2)

PDR: liq

C. Wisner

LPDR

NSIC

NTIS

t