ML20050D443

From kanterella
Jump to navigation Jump to search
Forwards Errata to 1981 Annual Results & Data Rept for Point Beach Nuclear Plant,Units 1 & 2, & Info Required by NUREG-0737,Item II.K.3.3,in Response to NRC Re Reporting Relief Valve & Safety Valve Failures & Challenges
ML20050D443
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/30/1982
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20050D444 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.03, TASK-TM NUDOCS 8204120209
Download: ML20050D443 (1)


Text

_ __

l Wisconsin Electnc eona coursur 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 March 30, 1982 Mr. H.

R.

Denton, Director 9

Office of Nuclear Reactor Regulation U.

S. NUCLEAR REGULATORY COMMISSION

,f) j 4

8 Washington, D.

C.

20555 y gj -

Q> s ei, n ' Cb d >/ aj

~

'7 Attention:

Mr.

R.

A.

Clark, Chief g7 7;,:

j*<X Operating Reactors, Branch 3 g

[~

v :,

i. a O

'ef s

Gentlemen:

p 4

DOCKET NOS. 50-266 AND 50-301 i t. M '

ERRATA TO 1981 ANNUAL RESULTS AND DATA REPORT POINT BEACil NUCLEAR PLANT, UNITS 1 AND 2 It was recently brought to our attention that we inadvertently omitted from our 1981 Annual Results and Data Report for Point Beach Nuclear Plant, Units 1 and 2, the information required by NUREG-0737, Item II.K.3.3, Reporting Relief Valve and Safety Valve Failures and Challenges.

This discrepancy was an oversight on our part and in response to your March 24, 1982 letter is corrected with the enclosed errata sheet.

Very truly yours,

~

^

i 1

Executive Vice President Sol Burstein Enclosures (40)

D Copies to NRC Resident Inspector f

J.

G.

Keppler, Region III 5

I 820412O209 820330 PDR ADOCK 05000266 R

PDR

/