Docket No. 50-344 (RS)
m
@
l
N2
;
% '2h rj
Portland General Electric Company
'
0,9
-
121 S. W. Salmon Street
-
Portland, Oregon 97204
5
U84 [g
4;48%
Attention: Mr. Bart D. Withers
4 4
s
g
Vice President Nuclear
/ ,id l
',
Gentlemen:
Subject:
NRC Inspection of Trojan Nuclear Plant
This refers to the inspection conducted by Mr. G. llamada of this office
on January 12-14, 1982 of activities authorized by HRC License No. NPF-1,
and to the discussion of our findings held by Mr. Hamada with Mr. C. P. Yundt
t
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection roport. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
i
enclosure will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and submit written application to withhold information contained
therein within thirty days of the date of this letter.
Such application
must be consistent with the requireaents of 2.790(b)(1).
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
bec:
DMB/ Document Control Desk (RIDS) Sincerely,
Original signd D3
Distributed by RV:
HL8I
Engelken (w/o enci)
Resident Inspector
11. E. Book, Chief
State of OR (Godard)
Radiological Safety Branch
Enclosure:
lCA
Inspection Report
l
No. 50-344/82-0?
iT-UO
020412o202 820317
e'
3
c , r ,,
PDR ADOCK 05000
' ..
,
,
..,
, ...
.. . ...
~
o,,,
....~,.-,,9.
u .,,.. ,
f. , , , ,
,, , ,
,
,
, , ,
,
,,
"4 ,3/.d:Is2,.,
,3/,g/82,,
3g.7/,82
,,, ,, ,
,,
, ,,, ,,
, ,
,,,,
,,
,
,
we r emu m .m so.wcq:40
OFFICIAL RECORD COPY
_ _ ___ _ 2" ' ?";*
.
.
U.S. fiUCLEAR REGULATORY COMMISSION
REGION V
Report flo.
50-344/82-02 (RS)
Docket flo.
50-344
License fio,
flPF- 1
Safeguards Group
Licensee:
Portland General Electric Company
121 S. W. Salmon Street
portland, Oregon 97204
Faci 1ity flame:
Trojan
Inspection at:
Rainier, Oregon
Inspection conducted:
January 12-14, 1982
/6 ![S
Inspector:
U'MWrd< b
G.11. llamada, Radiation Laboratory Specialist
Date Signed
eh
3//6Ma
Approved by:
,
F. A. Wenslawski, Chief, R'eactor Radiation Protection
D4te Signed
Section
4
O!# 7!B >
W
Approved by:
li. E. Book, Chief, Radialogical Safety Branch
Date Signed
Summary:
Inspection of January 12-14, 1982 (Repor_t No. 50-344/82-02 (RS)
Areas inspected _:
Routine unannounced inspection of laboratory quality control program
for sampling and analyzing reactor coolant and reactor effluents. The inspection in-
volved a total of 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> onsite by one inspector.
Results:
No items of noncompliance or deviations were identified in the areas
inspected.