Forwards IE Insp Rept 50-344/82-02 on 820112-14.No Noncompliance Noted
ML20050D435
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/17/1982
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20050D436 List:
References
NUDOCS 8204120202
Download: ML20050D435 (1)


See also: IR 05000344/1982002

Text

e

-

Ct

, ,' D-

k

8

h,

.-

, - -

,

,

&

W

e'

q

.

.

MAR 17 1982

Docket No. 50-344 (RS)

m

@

l

N2

;

% '2h rj

Portland General Electric Company

'

0,9

-

121 S. W. Salmon Street

-

Portland, Oregon 97204

5

U84 [g

4;48%

Attention: Mr. Bart D. Withers

4 4

s

g

Vice President Nuclear

/ ,id l

',

Gentlemen:

Subject:

NRC Inspection of Trojan Nuclear Plant

This refers to the inspection conducted by Mr. G. llamada of this office

on January 12-14, 1982 of activities authorized by HRC License No. NPF-1,

and to the discussion of our findings held by Mr. Hamada with Mr. C. P. Yundt

t

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection roport. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

i

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information contained

therein within thirty days of the date of this letter.

Such application

must be consistent with the requireaents of 2.790(b)(1).

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

bec:

DMB/ Document Control Desk (RIDS) Sincerely,

Original signd D3

Distributed by RV:

HL8I

Engelken (w/o enci)

Resident Inspector

11. E. Book, Chief

State of OR (Godard)

Radiological Safety Branch

Enclosure:

lCA

Inspection Report

l

No. 50-344/82-0?

iT-UO

020412o202 820317

e'

3

c , r ,,

PDR ADOCK 05000

' ..

,

,

..,

, ...

.. . ...

~

o,,,

....~,.-,,9.

u .,,.. ,

f. , , , ,

,, , ,

,

,

, , ,

,

,,

"4 ,3/.d:Is2,.,

,3/,g/82,,

3g.7/,82

,,, ,, ,

,,

, ,,, ,,

, ,

,,,,

,,

,

,

we r emu m .m so.wcq:40

OFFICIAL RECORD COPY

_ _ ___ _ 2" ' ?";*

.

.

U.S. fiUCLEAR REGULATORY COMMISSION

REGION V

Report flo.

50-344/82-02 (RS)

Docket flo.

50-344

License fio,

flPF- 1

Safeguards Group

Licensee:

Portland General Electric Company

121 S. W. Salmon Street

portland, Oregon 97204

Faci 1ity flame:

Trojan

Inspection at:

Rainier, Oregon

Inspection conducted:

January 12-14, 1982

/6 ![S

Inspector:

U'MWrd< b

G.11. llamada, Radiation Laboratory Specialist

Date Signed

eh

3//6Ma

Approved by:

,

F. A. Wenslawski, Chief, R'eactor Radiation Protection

D4te Signed

Section

4

O!# 7!B >

W

Approved by:

li. E. Book, Chief, Radialogical Safety Branch

Date Signed

Summary:

Inspection of January 12-14, 1982 (Repor_t No. 50-344/82-02 (RS)

Areas inspected _:

Routine unannounced inspection of laboratory quality control program

for sampling and analyzing reactor coolant and reactor effluents. The inspection in-

volved a total of 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> onsite by one inspector.

Results:

No items of noncompliance or deviations were identified in the areas

inspected.

RV Form 219(2)