Approves Teledyne Engineering as Contractor to Perform Independent Design Review
ML20050D147
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/12/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8204120070
Download: ML20050D147 (5)


Text

E DISTRIBUTION:

Docket File WPHaas W f 2 1982 LB#2 File

. RJBosnak DEisenhut/RPurpl eDTerao RTedesco JSpraul ASchwencer bcc: TERA C Docket"Ilos.$ 50-373/374..]

ABournia NSIC EHyl ton NRC PDR Woodhead, OELD Local PDR

  1. /$, (16)

Mr. Cordell Reed OI&E 1

Vice President, Nuclear Operations Region III

'?

x Commonwealth Edison Company Resident Inspector g g

^l.

P. O. Box 767 SHanauer

'Ox Chicago, Illinois 60690 RMattsch 2

HThompson 6-6 S

Dear Mr. Reed:

RVollmer

~

RHartfield, MPA

Subject:

Independent Design Review for La Salle 9

e

'v m

We have reviewed the February 11, 1982 submittal from Commonwealth Edison regarding the independent design review to be conducted for La Salle by your contractor the Teledyne Engineering Services (TES). As a result of this review, we have the following comments:

1.

The NRC Staff approves Teledyne Engineering Services to ba the independent contractor to perform the independent design review for La Salle; 2.

The tasks proposed by TES are acceptable except that two review items as specified in our Supplement No. 2 to the Safety Evaluation Report (SSER-2) do not appear to be addressed.

These two items which should be included in the TES review are; The design verification records (item 3, page 17-3 of SSER-2),

a.

and b.

A determination of the adequacy and implementation of the design for the La Salle County Stat ton Unit 1 based on all the above (item 9, page 17-4 of SSER-2);

3.

The composition and function (s) of the 10 CFR Par t 21 committee (Sections 3.10 and 4.3 of the TES Technical Proposal) should be given; 4.

J.H. Malonson and D. Messinger have their resumed included in Section 7 of the TES Technical Proposal where they are shown as Project Quality Assurance Specialists. To whom do these individuals l

report and what will be their function during the TES review; and finally 8204120070 s20312

$DRADOCK 05000373 PDR omcc) suaswe >

orre >

Nac ronu sie oo eon uncu ono OFF1ClAL RECORD COPY useoansm uo

'N

'i%

y Cordell Reed 5.

The TES program proposes to provide two reports, initial status report and a final report. The initial status report will provide details of any findings which have been through the entire review process at that time, and the final report will contain all findings which have been processed through the project review internal committee. There is no mention of the documentation of reports filed by TES reviewers as items arise, nor is there any mention of the documentation of how each item is systematically resolved.

We feel that documentation of all detail reviews should be available to provide a more accurate audit trail.

If you desire any further discussion, please contact A. Bournia, Licensing Project lianager, (301) 492-8196.

Sincerely, Original signed b7' p: 1 ci, anhut Darrell G. Eisenhut, Director Division of Licensing cc: See next page

  • See next page for previous concurrences

. /?

DL.:.LB # 2 /..P. M.

DL:LB #2/BC DL : AD/..L..

. D. E.: D I.R...

..# 6LT. D.R........

omc>

m..

sua~4=r >..AU.0.uta.i.a.:.pt...AS.c hwencgg....BT.gd.gs.p.p....... 8y.0.1.1.agt......Rs nh 9..t....

.....d/8 2 3/l 3/:lt /82 3/1/82 3/1/82

..../ 3 /8 2 3

tara >

we rosu m oom uscu om OFFICIAL RECORD COPY usom ini-muo

l l

DISTRIBUTION:

Docket File JSpraul LB#2 File DEisenhut/RPurple bcc : TERA RTedesco NSIC Docket Nos. 50-373/374 ASchwencer NRC PDR ABournia Local PDR EHyl ton ACRS (16)

Cordell Reed Woodhead, OELD Vice President, Nuclear Operations 01&E Commonwealth Edison Conpany Region III P. O. Box 767 Resident Inspector Chicago, Illinois 60690 SHanauer RMattson

Dear Mr. Reed:

HThompson RVollmer

Subject:

Independent Design Review for La SalleRHartfield, MPA WPHaas RJBosnak DTerao We have reviewed the Febraury 11, 1982 submittal from Commonwealth Edison regarding the independent design review to be conducted for La Salle by your contractor the Teledyne Engineering Services (TES). As a result of this review, we have the following coments:

1.

The NRC staff approves Teledyne Engineering Services to be the independent contractor to perform the independent design review for La Salle; 2.

The tasks proposed by TES are acceptable except that two review items as specified in our Supplenent No. 2 to the Safety Evaluation Report (SSER-2) do not appear to be addressed.

These two items which should be included in the TES review are; a.

The design verification records (item 3, page 17-3 of SSER-2),

and b.

A determination of the adequacy and implementation of the design for the La Salle County Station Unit 1 based onaall the above (item 9, page 17-4 of SSER-2);

3.

The composition and function (s) of the 10 CFR Part 21 comittee (Sections 3.10 and 4.3 of the TES Technical Proposal) should be given; 4.

J.H. Malonson and D. Messinger have their restines included in Section 7 of the TES Technical Proposal where they are shown as Project Quality Assurance Specialists. To whom do these individuals report and what will be their function during the TES review; and finally

Cordell Reed 5 The TES program proposes to provide two reports, initial status report and a final report.

details of any findings which have been through the entire reviewT which have been processed through the project review inter committee.

filed by TES reviewers as items arise, nor is there any ment We feel that documentation of all detail reviews be avail provide a more accurate audit trail.

If you desire an Project Manager,y further discussion, please contact A. Bournia, Licensint (301) 492-8196.

Sincerely, Darrell G. Eisenhut, Director Division of Licensing cc: See next page l

l l

I I

O, DL:(d./PM DLQ. 2/BC Bf2 D

D/L D E $....v...

omer >

Mo(urnia;,ptM t(,,ncet,

RV011mer DEisenhut OL:DIR 1

sunsat) esco om>

3Z9.#.82.,,

3p.za2...

.y[../.82,.

3g,482

' y..../82, me ronu ssa cimeos uncu cao OFFICIAL hECORD LOPY usam mi-m m

s Cordell Reed 5.

The TES program proposes to provide two reports, initial status report and a final report. The initial status report will provide details of any findings which have been through the entire review process at that time, and the final report will contain all findings which have been processed through the project review internal committee. There is no mention of the documentation of reports filed by TES reviewers as items arise, nor is there any mention of the documentation of how each item is systenatically resolved.

We feel that documentation of all detail reviews be available to provide a more accurate audit trail.

If you desire any further discussion, please contact A. Bournia, Licensing Project Manager, (301) 492-8196.

Sincerely, Darrell G. Eisenhut, Director Division of Licensing cc: See next page I

i i

l i

i DL:

DL 2/BC D'

D/L D E$,...f.......

_.....a(B d2/ PMg.......

DL:DIR o,nc,6 sunwar b

.@.ou,rni,a,q p,t AS,c,,

neer

' I esco RVbilmer-DEisenhut

. 329.#.32,,,.. 33..g2,.,...3Ij..gz.. g.182...!.3L.L82..

me >

NRC FORM 318 00-80) NRCM ono OFFICIAL hECORD C.OPY usom im-m. o

Mr. Louis 0. De1 George Director of Nuclear Licensing Cc=nonwalth Edison Company P. O. Box 767 Chicago, Illinois 60690 cc:

Philip P. Steptoe, Esquire Suite 4200 One First National Plaza Chicago, Illinois 60603 '

Dean Hansell, Esquire Assistant Attorney General 188 West Randolph Street Suite 2315

~

Chi ago, Illinois 60601 Roger Walker, Resident Inspector LaSalle NFS, U.S.N.R.C.