Text
T f
E?'Cf.0S" ": I DESMTPTIO!! OT Ymi..'.TTO::S_
Consolidated Elison Ccapany 4 Irving Placc New.Yorh, Uut York 1C003 Docket ::o. 50-247 The follo. ing items ucre fot,nd to be. in cpparent violation of AEC requirc-ments as indicated belou.
These apparcut violations arc considered to bc of Category III severity.
Technical Specifications for Indian Point Unit No. 2, Sectica 6.11 " Emergency Plan" states in part that a site emergeacy plan shall be maintained through-out the life of the facility. Violations have been identified with respect to requirements of the aforementioned Emergency Plan.
Section 12.0.1 of the Indian Point Emergency Plan requires that internal 1.
practice excrcises be performed on a semi-annual basis in order to den-onstrate adequate familiarization uith cmergency procedures by members of the operating staff.
The semi-annual requirement for practice exercises as stated (NOTE:
in the Emergency Plan is in addition to Sectica 6.11.2 of the Technical Specifications which requires that a site evacuation exercise be con-least annually utilizing applicabic provisions contained with-ducted at Evacuation exercises can, however, be conducted in the Emergency Plan.
in conjunction uith internal practice exercises.)
Contrary to the above requirement biternal practice exercises of the f
required scope were conducted in April 1973 and April 1974, an interval exceeding semi-annual.
Section 12.0.2 of the Indian Point Emergency Plan requires that individuals 2.
responsible for implementing emergency response actions be trained to a Individuals degree commensurate with their deligated responsibilitics.
with special responsibilities relating to the supervision and coordina-tion of emergency activities normally receive intensive training in these acti?ities as they are not an extension of their regular non-cmergency ecsponsibilitics.
individuals designated as Emergency Directors Contrary to this requirement, in the Icu.in Point Emergency Plan or General Untch Foreman who act as Interim Emo gency Directors under cmcrgency conditions had received no
. training beyand a general familiarization with the Emergency Plan.
8204090460 740624 DR ADOCK 05000003 PDR a
L 3.
Section 12.0.3 sf the Indian Point Erargency.' a requires a weekly check of (a) cerc.unicatler'e. batuaan a licenrad reactor in the Central Centrol. P.oce and the Sy.:tcr! Operr.tcr at the Con Edicon 'ner'y Centrol J
Ccater and (b) cerunicatiuns betuaca a Central Coatrol "oc= Operator cr.d the tuo ;urvcy. Uiclar..
. Contrar/ to these requirements, the aforementiened communications chocks had not been cenducted er, a ucekly basis.
Chachs with the Energy Control Center had been conducted on an internittent" basis during 1973 but none had been coaductc<1 from January throu;h April 11, 1974.
Checks with survey vehicles had not been conducted during 1974.