ML20050C898

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1981
ML20050C898
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 09/15/1981
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20050C889 List:
References
NUDOCS 8204090445
Download: ML20050C898 (1)


Text

,

a s. .

OPERATING DATA REPORT DOCKET NO 50-369 DATE 9-15-81 COS!PLETED 13Y J. A._Renvis-TEl.EPHONE _704-373-B552 OPI R ATING ST \TUS L.nit .N.ame; McGuire Unit 1 Notes : McGuire Unit 1 Under-1

2. Reporiing Period. ^"fl"8 E ' I9 lwent zero power physics testing and low power test-
3. Lucowd liiermal Po .er Qlht h bI ing (<5% power) during this a Nameplate Raimg (Gross Albet reporting period.

5s Design Electrical Rating (Net 51 Web -

6. \tatunu.n Dependable Capacity 4 Gros > .\1h e t

" .\f nimum Dependable Capaaty (Net Tiber i  !

S If Changes Occur in Capauty Ratings iltems Number 3 Through 7) Since Last Report. Cne Reasons:

None

9. Powcr Lete! To h nch Restricted. lf -\ny (Net NtWet None
10. Rea,ons For Restrienons. If Any:

This 31onth Yr..to Date Cumula tiv e, 11 lioats in Reportnig l'enod

!! Number Of Ilours Reactor was Crincal 13 Reutor Reserve Shutdown liours 10T IN C0FDIERCIAL OPERATIOS

14. Ilours Generator On-Lme
15. Umt Rewne Shutdown Hours 16 Grow Ihs rmal Energy Cencrated (5thli) 17 Gron Electrical Enerp Generated 15thil) 15 Net Elettrical Energy Generated (\twll)
19. Umt senice f actor 2 L) Umt An adJtidity Factor
21. Umt Capacity Factor IUsor; \1DC Net)
22. Umi Capaaty Factor tUung DER Net)
3. Unit Forced Out.rp Rate 24 Shutdowns Scheduled Ostr Nes: 6 Thu.ths (Ty pe, Date. and 1)uration of Eachi 25 If Shut Down At E nd Ot Rep.ot Penod. Estimated Date of ',:::rtup. __

20 Units la lest Status tPrior to Commeraal Operationt forecav Achieved IN! TIT L CRillC \ LITY INITI \ L'El ECl RICITY Cost \fl RCI AL OPER -\ IlON 8204090445 010915 'ol77I PDR ADOCK 05000369 R PDR