Text
.
1
)
OPERATING DATA REPORT 50-369 DOCKET NO.
DATE 10-15-D1 COhlPLETED BY J. A. Reavis TELEPHONE 704.373-8552 OPERATING STATUS McGuire Unit 1 Notes McGuire Unit I under-
- 1. Unit Name:
- 2. Reporting Period: September, 1981 vent power escalation testing 3,41]
during this reporting period.
- 3. Licensed Thermal Power ()thr):
- 4. Nameplat.: Rating (Gross 31Wei:
1,220
- 5. Design Electrical Rating (Net atWe): 1,180
- 6. Statimum Dependable Capacity (Gross StWel:
- 7. Staximum Dependable Capacity (Net StWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted. lf Any(Net atWe):
- 10. Reasons For Restrictions. If Any:
nis 31onth Yr..to.Date Cumulative
- 11. Ilours in Reporting Penod
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown flours
- 14. Ilours Generator On.Line Not in commercial Operation
- 15. Unit Reserve Shutdown flours
- 16. Gross Thermal Energy Generated (StWH)
- 17. Gross Electrical Energy Generated (SIWH)
- 18. Net Electrical Energy Generated (AtWH)
- 19. Unit Service Factor
- 20. Unit Asadability Factor
- 21. Unit Capacity Factor IUsing 31DC Neti
- 22. Unit Capacity Factor IUsing DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next o Stonths (Type. Date, and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of ~.,t:rtup:
- 26. Units in Test Status iPrior to Commercial Operationi:
Forecast Achieved INITIA L CRITICA LITY 8-3-81 INITIAL ELECTRICITY 9-12-81 COstStERCIAL OPER ATION 12-81 R200090431 011015 PDR ADOCK 05000369 R
PDR 10/7'l
a MCGUIRE fiUCLEAR STATI0fi Operating Status Report 1.
Personnel Exposure For the month of August, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release contribution to whole body dose for August has been compared with the Technical Specifications annual value of 3 mrem; the total release for August was less than 10 percent of this limit.
1 l
The total station gaseous release contribution to any organ dose for August has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for August was less than 10 percent i
of this limit.
1