ML20050C811
| ML20050C811 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 04/01/1982 |
| From: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, G3-82-322, GO3-82-322, NUDOCS 8204090373 | |
| Download: ML20050C811 (2) | |
Text
c 4
1 s
Washington.P6blic Power Supply System
~.,' N Box 1223 Elma, Washington 98541 (206)482-4428 ff,t-t O
g//
ch '\\
,D
,.n y
+
,.df'gf D
~
Y [%
a:-
I Docket Numbers 50-508 and 50-509 n
April 1, 1982 I
G03-82-322
/g@
Document Control Desk U. S. Nuclear Regulatory Commission Washington D. C.
20555 l
Subject:
PROJECT N05. 3 AND 5 INTERIM REPORT OF POTENTIAL 10CFR50.55(e)
ARTIFICIAL ENHANCEMENT OF RADIOGRAPHIC FILM (D/N #41)
Attached is a copy of an interim report provided to Region V concerning a potential 10CFR50.55(e) associated with the subject condition.
Should you have any questions or desire further information, please con-tact me directly.
l.
. S. Leddick, 760 Program Director, WNP-3 DRC/tt Attachment cc:
J. Adams - NESCO-WO/A D. Smithpeter - BPA-WO/A Ebasco - New York-WO/A WNP-3/5 Files - Richland-WO/A 7
C
.s
//
8204090373 820401 PDR ADOCK 05000508 S
PDR i
......u...............se NT[ tet",T i 1OtiT10.?
" "* " " '" 15' " " U " E5
- S" ^ "E # ~ *
COMMITMENT C0fiTROL ROUTING WPPSS cosmisPO.YDEt;cE t:0.
N'
~
SITE FIEES WG 4LBERT/tiRC-712 DR C00DY-750 g
DE 00BSON-760 JJ DORAN-723 R8 GLASSC0CK-280 CM KIM-707 DJ LAGRDU-751 DD O'SULLIVAN. Docket Numbers 50-508 and 50-509 280 March 30, 1982 RG PECK-701 G03-82-297 JJ PETERSON-710 DL QUAMME-723 JP SLUKA-707 GC SORENSEN-U. S. Nuclear Regulatory Commission, Region V vv 440 Office of Inspection and Enforcement
\\
<g OE TRAPP-761 1450 liaria Lane, Suite 260
\\
wi Walnut Creek, Califorriia 94596-5368 m"
Attention:
Mr. T. W. Bishop l
Chief, Reactor Construction Projects rg o
C
Subject:
PROJECT NOS. 3 AND.5
\\
ji INTERIM REPORT OF POTENTIAL 0F(0.'5(eh i
ARTIFICIAL ENHANCEMEN F RA 'O RANil FILK4t/N #41) y i
e
Reference:
Letter, G03-82-021,1 d it Janua '
,!982, R. S.
O Leddick to B. H. Fa ikonb
, s amt. subject.
The referenced letter forwarded ar. in erin report of the subject condi-2 tion and noted that a final report w be provided to your office by
(
t
!! arch 31, 1987 s
F es I
that had enh\\nc,opgncluded the' identification of all spools on site Corrective cti i
edfadiographicfilm.
The affected spools were then re-w l
ra 'ographed.\\ Dt a concern with radiographic technique, one of the e 'ed spool \\rece' ed a third radiograph which was subsequently for-
- a. r s
war 'e to AP&E,
~ pton, for review and acceptance.
To date, results of t
, 9&F eview have not been received.
As a result, the final re-sort w'l r-rovided by April 30, 1982.
1
{
"h Id you have any questions or desire further information, please E
f l
/
c 3 ect me directly.
]
+'
[/ b g
e v
C R..i Aeddick, 760
.E m
Program Director, WNP-3/5 I
l$
59 :-lE DRC/tt 99 E
U t
cc:
J. Adams - NESCO gG M E
D. Smithpeter - BPA t_
Ebasco - New York WNP-3/5 Files - Richland
.