Docket No. 50-266(DETP)
'
Docket No. 50-301(DETP)
S
%ECSygg *
,
Wisconsin Electric Power Company
APR 8 ;ggg
"%h
'f
NITN:
Mr. Sol Burstein
Executive Vice President
rag
Power Plants
q
231 West Michigan
4
N
Milwaukee, WI 53201
This refers to the routine safety inspection conducted by Mr. D. L. Robinson
of this office on March 2-3, 1982, of activities at Point Beach Nuclear
Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-24 and
No. DPR-27 and to the discussion of our findings with Mr. G. A. Reed and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
'
NRC's Public Document Room.
If this report contains any information that
you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
i
8204090362 820323
PDR ADOCK 05000266
O
~
,
Wisconsin Electric Power Company
2
E.1 23 3d2
I
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
whfch identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
4/ fo /d4MtL
7 C. E. Norelius, Director
&
Division of Engineering and
Technical Programs
Enclosure:
Inspection
Report No. 50-266/82-07
and No. 50-301/82-07
cc w/ enc 1:
G. A. Reed, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief Boiler
Inspector
Peter Anderson, Wisconsin's
Environmental Decade
Stanicy York, Chairman
Public Service Commission
'
RJ1}a
II/
RIII
RIII
RII
Rbbi/jp
unkrw
M
bit \\e
k n
vorelius
3/12/82