ML20050C682
| ML20050C682 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 03/24/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| Shared Package | |
| ML20050C683 | List: |
| References | |
| NUDOCS 8204090250 | |
| Download: ML20050C682 (2) | |
See also: IR 05000546/1982004
Text
_
.
.
MAR 2 4 62
Docket No. 50-546(DETP)
e
A
Docket No. 50-547(DETF)
p
g
\\
Public Service of Indiana
g
ATrN:
Mr. S. W. Shields
E
9
APR 8
tg
~
Senior Vice President
. --
--
Nuclear Division
p
saamegguw g h
Post Office Box 190
kam aamtu,
New Washington, IN 47162
'b
//
Gentlemen:
4
,.
This refers to the routine safety inspection conducted by Mr. F. C. Hawkins
of this office on March 2-5, 1982, of activities at Marble Hill Nuclear
Generating Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with
Mr. C. Beckham and others of your staf f at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
i
NRC's Public Dccument Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a :equest for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this of fice
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
8204090250 820324
PDR ADOCK 05000546
O
%N61 i
.
.
.
Public Service of Indiana
2
MAR 2 4 is82
please notify this office promptly so that a new due date may be estab-
11shed. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original Slaned by c.t. IfiQggy
C. E. Norelius, Director
Division of Engineering and
Technical Programs
Enclosure:
Inspectiori
Report No. 50-546/82-04(DETP)
and No. 50-547/82-04(DETP)
cc w/ enc 1:
W. M. Petro, Executive Director
Nuclear Project Management
C. Kammerer, CA
J.11. Sniezek, D/DRRRI
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
LeBoeuf, Lamb, Leiby & MacRae
Dave Martin, Office of Attorney
General
John R. Galloway, Staff Director
Environment, Energy and Natural
'
Resources Subcommittee
E. P. Martin, Wabash Valley Power
Association
Thomas M. Dattilo, Save the Valley
RIII
RIII
RIII
RIII
K(IIiskNs/jph"[in
~
L121e
M us
Wii1iams
3P
3/20/82
3v
/'