Forwards IE Insp Rept 50-346/82-10 on 820301-04.No Noncompliance Noted
ML20050C616
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/24/1982
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20050C617 List:
References
NUDOCS 8204090169
Download: ML20050C616 (2)


See also: IR 05000346/1982010

Text

e

.

March 24, 1982

Q

k

Docket No. 50-346(DEPOS)

g

Toledo Edison Company

MUMO

9

ATfN:

Mr. Richard P. Crouse

Vice President

2

Apgg g b h

meusasumeTr

Edison

a

300 Madison Avenue

DK

Toledo, OH 43652

'b

'/

@

~

Gentlemen:

This refers to the routine safety inspection conducted by Drs. M. J. Destmann

and S. Rozak of this office on March 1-4, 1982, of activities at Davis-Besse

Nuclear Power Station, Unit 1, authorized by NRC Operating License No. NPF-3

and to the discussion of our findings with Messrs. Briden and Scott at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

In addition, our Mobile Laboratory was at the

site during the inspection to perform independent measurements of radio-

activity.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days f rom the date of this letter a written application to this of fice

to withhold such informa+1on.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

8204090169 820324

PDR ADOCK 05000346

O

PDR

S&

.-

_ _ _ .

-

,- - _.

. _ - _ _ -

._

_

.-

--

--

_

,

'

.

Toledo Edison Company

2

March 24, 1982

,

!

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

i

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

'

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

j

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

l

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

'

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

.

Sincerely,

i

l

U4

. A. Hind, Director

i

Division of Emergency Preparedness

and Operational Support

Enclosure:

Inspection Report

,

'

No. 50-346/82-10(DEPOS)

cc w/ enc 1:

T. D. Murray, Station

'

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

!

Commission

Helen W. Evans, State of Ohio

!

Robert M. Quillin, Ohio

Department of Health

t

4

,4f/'

RIII

RIII

RIII

RIII

RIII

-

N

[

Uestmann/jp

R#zak

Schumacher

Pa e/ fello

IH d

kv

3/19/82

MM/ &

yt)/) D

  1. )[d

4

,

i

i

$

-- -

- . . . - - - . . . . -- -

. .

-

- .

- -

- - -