March 24, 1982
Q
k
Docket No. 50-346(DEPOS)
g
Toledo Edison Company
MUMO
9
ATfN:
Mr. Richard P. Crouse
Vice President
2
Apgg g b h
meusasumeTr
Edison
a
300 Madison Avenue
DK
Toledo, OH 43652
'b
'/
@
~
Gentlemen:
This refers to the routine safety inspection conducted by Drs. M. J. Destmann
and S. Rozak of this office on March 1-4, 1982, of activities at Davis-Besse
Nuclear Power Station, Unit 1, authorized by NRC Operating License No. NPF-3
and to the discussion of our findings with Messrs. Briden and Scott at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
In addition, our Mobile Laboratory was at the
site during the inspection to perform independent measurements of radio-
activity.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days f rom the date of this letter a written application to this of fice
to withhold such informa+1on.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
8204090169 820324
PDR ADOCK 05000346
O
S&
.-
_ _ _ .
-
,- - _.
. _ - _ _ -
._
_
.-
--
--
_
,
'
.
Toledo Edison Company
2
March 24, 1982
,
!
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
i
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
'
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
j
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
l
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
'
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
.
Sincerely,
i
l
U4
. A. Hind, Director
i
Division of Emergency Preparedness
and Operational Support
Enclosure:
Inspection Report
,
'
No. 50-346/82-10(DEPOS)
cc w/ enc 1:
T. D. Murray, Station
'
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
!
Commission
Helen W. Evans, State of Ohio
!
Robert M. Quillin, Ohio
Department of Health
t
4
,4f/'
RIII
RIII
RIII
RIII
RIII
-
N
[
Uestmann/jp
R#zak
Schumacher
Pa e/ fello
IH d
kv
3/19/82
MM/ &
yt)/) D
- )[d
4
,
i
i
$
-- -
- . . . - - - . . . . -- -
. .
-
- .
- -
- - -