ML20050C547
| ML20050C547 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 09/27/1974 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | William Cahill CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| Shared Package | |
| ML20050C548 | List: |
| References | |
| NUDOCS 8204090045 | |
| Download: ML20050C547 (2) | |
See also: IR 05000003/1974009
Text
,
_.
!
7
,
_
"'
- - ."
UNITrD ST A f t:'
I
ATC'AIC F l!CRGY CO*.iM.GION
\\
' . ' ' ' -
'(' ' .
oua r a vu r. r s o r es e s.u s w ea u.., n a r wn.,
I
.
sa a. sun s
. ~ .
(. '
- " -A
'
'
m n2,.4xvenuc
3,
f-/
KlHF OF P AUS a A 6 FMNLYLVa.'.% IM;;*.
\\d=
.y'
SEP Tl $n
-
'
-
ConsolidatedEdisonCompan5*ofNewYork,Inc.
License Nos. DPR-05
Attention:
Mr..W. J. Cahill, Jr.
Vice President
4 Irving Place
Inspection Kos. 50-03/7'-C9
C5DT T7/74-O
2
Neu York, Meu York
10003
Genticmen:
This refers to the inspection conducted by Mr. Fasano of this
office on July 8-31, August 1-8 and September 11, 1974 of activities
authorincd by AEC License Mos. DPR-03 and DPR-26 and to the
discussions of our findings held by Mr. Fasano uith Mr. Stein of
j
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Regulatcry
Operations Inspection Report which is enclosed uith this letter.
Within these arcas, the inspection consisted of selactive examinations
of procedures and representative records, intervices with personnel,
and observations by the inspector.
During this inspection, it uns found that certain of your. activities
appeared to be in violation of AEC requirements.
The items and
'
reference- to the pertinent requirements are listed in the enclosure
to this lctter. This letter constitutes'a notice sont to you
pursuant to the provisions of Section 2.201 of the AEC's " Rules
of Prac tce", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requ;res you to submit to this_offica uithin 20 days'
of your receipt _of this notice, a written statement of explanation
in reply, including: (1) corrective steps which have been or vill
be taken by you, and the results achieved; (2) corrective steps
which vill be taku to avoid further violations; and (3) the
date when full compliance vill be achieved.
-
In accordance with Section 2.790 of the AEC's " Rules of Practice",
Part 2, Title 10, Code of rederal Regulations, a copy of this
letter and the enclcsed inspection report uill be placed in the
AEC's Public Docume e Room.
If this report contains any informatica
that you_(or your contractor) believe to be proprietary, it is
necessary that you make a written application uithin 20 days to
this office to uithhold such information from public disclosure.
i
'
.
6 -
a
o +'.
-
"
8204090045 740927
gDRADOCK 05000003
l
_ __ _ _ __ , _ _ .
_ . _ _ . .
_
.
.
.
.
.
.
J'
Censo11.:. iced Edicon Compay of 1: i York, Inc.
e.
'
'
,{-
-
.
,
-
.
Should you have any questions concerning this inspcction, tic trill
be pleased to discuss thma tilth yeu.
Sincerely,
.
(- Q%..c_ m
c
El pn J. Brunner, Chk f
Repcter Operations Branch
Enclosures:
1.
Description of Violations
2.
RO Inspection Report :!o. 50-05/74-09 and 50-247/74-11
cc:
A. E. Upton, Esqu#':c
A. Kohler, nesident Construction IIanager
U. Stein, !!anecer, !!uclear Pc :ar Generation Depart =cnt
J. I!akopcace, Chief Engineer Unit 2
A. Z. Roisnan Councel for Citi:: ens Co- titron for Protectie-
of the Environ.:nt (Iitnout Report)
bec:
RO Chief, FSGCB
RO:IIQ (4 cpys of Itr., 5 cpys of report)
RO Files
Central I* ail & Files
'
-
DL (4 cpys of ltr., 13 cpys of report)
RS (1 cpy of ler., 3 cpys of report)
Iocal PDR
-
State of Nov York
Reg Ecg Reading Roots
RO Directora (II, III, IV) (Heport only)
'
A. Z. Ecic=sn, Counsel for Citizens Cor:sittee for Protection of tha
Enviroc=ent
-
.