ML20050C336

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp on 820125-29.Corrective Actions:Welds to Be Reworked
ML20050C336
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/11/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20050C326 List:
References
ANPP-20370-BSKY, NUDOCS 8204080411
Download: ML20050C336 (4)


Text

[V R 3 R Z{B it h ' f TPJZ1h3D @MUI\\7BDM @@3HPA'iSW

~

P. O. BOX 216 6 6 PHOENIX, ARIZON A 85o36 March 11, 1982 ANPP-20370-BSK/ JAR U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596 Attention:

Mr. B. H. Faulkenberry, Chief Reactor Construction and Engineering Support Branch

Subject:

NRC I&E Inspection of January 25-29, 1982 File: 81-019-026 D.4.33.2

Dear Sir:

This letter refers to the Inspection conducted by Messrs. J. H. Eckhardt, J. F. Burdoin and G. Ilernandez on January 25-29, 1982, as documented in your letter of February 11, 1982, of activities authorized by the Nuclear Regulatory Commission (NRC) Construction Permit Nos. CPPR-141,142 and 143.

During this Inspection, one (1) item of noncompliance was. identified.

Our initial response to this item of noncompliance (Severity Level V-Supplement II) is presented in the enclosed Attachment A.

The reinspection effort associated with this noncompliance is scheduled for completion by April 10, 1982. A complete report will be issued to you by April 19, 1982.

Very truly our,

h OA; E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:ske g

Attachment

[]

w cc:

D. B. Fasnacht if3 m

-:b,o R. L, Robb 5E J. M.' Allen 2

@jEl A. C. Rogers 8204000411 820329 U.

U J. A. Roedel PDR ADOCK 05000528 C5 W..E. Ide G

PDR A.' C. Gehr

.N W. 11., Wilson W. J. Stubblefield R. L. Patterson

.R. M. Grant D. R. ~ llawkinson L. E. Vorderbruemen

bb~bb ]

u

STATE OF ARIZONA

)

) ss.

COUNTY OF MARICOPA )

I, E. E. Van Brun~t, Jr.

, represent that I am Vice President, Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

IT m-(

k

'y 0

E. E. Van Brunt, Jr.

Sworn to before me this

/

day of N/M/

19_ h

/L ot, e

Notary Public My Commission Expires:

NO M3 19

_s

-l

. - ~.

-ATTACHMENT A Docket:No. 50-528 j

Construction Permit No. 141 1

NUTICE OF VIOLATION j

As a result of'the, Inspection conducted on January 25-29, 1982 and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:

Appendix'B of'10CFR50,' Criterion V, as addressed'in Paragraph

.5.1 of the Quality Assurance Program in Appendix A to the PSAR, stateo in part: " Activities affecting quality shall be prescribed-by' documented instructions, procedures,. or drawings, of a type appropriate to the' circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings....."

Bechtel Drawing No. 13-C-ZCS-655, Revision 2, which governs structural steel column fabrication, in Section G, " Weld Detail:,

depicts fillet welds on the outside of the column flange to base _ plate intersection.

Contrary to the above, on January 28, 1982, three columns at the 149' Elevation of the Unit 1 Containment Building were found to lack the required welds. The column welds had been inspected and accepted at a Bechtel approved vendor fabrication shop prior to shipment to the site.

This is a Severity Level V Violation (Supplement II), applicable to Unit 1,

RESPONSE

1, Corrective Actions Taken To Date and Results Achieved Nonconformance. Report, NCR-CC-3186, was written to document the nonconformance and corrective action. The missing welds were completed on February 2, 1982.

2.

Corrective Steps That Have Been Taken To Avoid Further Noncompliance a.

Corrective Action Request S-82-13 was issued to' supplier, Marathon Steel Company on February 4,.1982, requesting investigation to determine cause and' corrective action to prevent _ recurrence, b.

.Bechtel Construction' issued an Interoffice Memorandum,.

B/MSC-K-10037,.to Marathon Steel Company advising them of the weld problem and requesting Marathon-to dispatch an-

~ inspector'to perform field inspection to assure that problem did not _ exist on previously shipped items.

c..

Subsequent inspection by Marathon found three additional I

columns with missing" welds, two on Unit 1, one~on Unit.3.

LNonconformance report NCR-CC-3253' dated February 23, 1982 was issued'for the Unit 3 column and NCR-CC-3279 dated

~

March.4, 1982'was issued for the Unit 1 columns. Rework of 1

the missing welds will'be documented 'cnt the NCR's.

1

,g Atttchment A-Notice of Violation Page 2 3.

Dat'e When Full Compliance Will Be Achieved The scheduled completion date for the reinspection effort and rework of the missing welds is April 10, 1982. A-final response will be issued at that' time.

_