Text

. _ _ _ _ _ _. _ _ _ _. _.

i

/

j '"

MAR 3 01982 DISTRIBUTION:

DocketFiles(2)/

A Docket Hos. 50-450 8

g and 50-451 vy

<b PDR LPDR y

License Fee File

,7 JECEIVED g

DJDonoghue, ADM Dolmarva Power and Light Compal PM 311382*. -! RFonner, OELD

'7 untramwem 10 WOMiller, LFMB ATTH: Mr. William G. Price l

Vice President - Generat inc CJHolloway, LFMB KLKohler, LFMB 800 King Street g

f, Wilmington, De.

19899 RfiDiggs, LFMB N

LTremper, LFMB Gentlemen:

LFMB R/F (2)

By letter dated December 5,1930. Hunton and Williams, counsel for Delmarva Power and Light Company, requested termination of proceedings and withdrawal of the construction permit application for Sumit 1 and 2.

On April 9, 1981, the Atomic Safety and Licensing Board Panel granted the motion to withdraw the application and terminate the proceedings:for Summit 1 and 2.

Under 10 CFR Part 170, it is Comission practice to recover review costs using the procedures of Footnote 3 to 10 CFR 170.21 when the review of the project is complete. The review of this project was completed as of April 9, 1981, the date that the Atomic Safety and Licensing Board Panel dismissed the proceeding. Accordingly, we have determined the actual expenditures incurred for professional manpower and contractual support services from the date the application was filed to its date of withdrawal. Actual costs for Unit 1 were $1,031,319 and $6,718 for Unit 2.

Under the Commission's regulations, we limit the charge for review to that which would be applied 4

to the construction permit under 10 CFR 170.21.A.1, that is, $1,031,319 for Unit 1 and $6,718 for Unit 2.

$70,000 has already been paid as an application fee. The balance due for the review of the construction permit application is as follows:

1 Unit 1 Actual Cost-

$1,031,319 Unit 2 Actual Cost 6.718 Subtotal 51,038,037 Less Application Fee

-70.000 Balance Due HRC 5 968,037 i

We have notified the HRC Office of the Controller to issue an invoice to Delmarva Power and Light Company to cover the Commission's review costs.

Sincerely.

Originut shmed by

.wm. o. :nner William 0. Miller, Chief 1

14conw Fn s Manammnnt Reanch L,F[p: A,0f,1,

, LFliB Dfj,,,,,

,0,E L D,,,,(,,

0ffice 0f \\dministratio rt h..........,.........,.,,.....,

.,,1,L,F,f,1B ADM,,,,

1 omco wmzo n@1.e.t:.hs.

..away.....REan

...woni. 1e.r....

"""/""82 3/%r /82 3/16/82 3M 87.

3

"""~

" ~~" ~

r204070632 820330 Mcr PDR ADOCK 05000450

,FFICIAL RECORD COPY usamm-mmo

. 6) -

_ _. _ _ _.. _ P D R_ _ _ _. _ _ _

,