ML20050B902
| ML20050B902 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/02/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20050B903 | List: |
| References | |
| NUDOCS 8204070539 | |
| Download: ML20050B902 (2) | |
See also: IR 05000321/1982005
Text
a
SAFEGUARDS INFORMATION
4
'
-
.
.
,
,
MAR 0 21982
Cd
M
f
/
C'
Georgia Power Company
@;O
-
ATTN:
J. H. Miller, Jr.
v
g'h p )
Executive Vice President
id
e
p
P. O. Box 4545
2
9
,c9 @{ V
-fg
7
Atlanta, Georgia 30302
6
g
g
@
c'
Gentlemen:
,
Subject:
Report Nos. 50-321/82-05 and 50-366/82-05
'C1
cr>
This refers to the routine safeguards inspection conducted by Mr. R. Goode of
this office on February 8-12, 1982 authorized by NRC License Nos. OPR-57 and
NPF-5 at the Edwin I. Hatch Nuclear Plant and to the discussions of our
findings held with Mr. T. Greene, Assistant Plant Manager, at the conclusion
of the inspection.
Areas examined during this inspection included your physical security program
as implemented under the provisions of Title 10, Code of Federal Regulations,
Part 73, " Physical Protection of Plants and Materials", and tha specific
requirements of your approved Security Plan. Within these areas, the
inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, performance tests, and
observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
Details of activities involving safeguards information are exempt
from disclosure in accordance with 10 CFR 73.21.
Therefore, your response
should be incorporated in a separate paper and referenced in your reply.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items are
discussed in the enclosed report.
9
The material enclosed herewith contains Safeguards Information as defined by
10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by
Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
0204070539 820302
PDR ADOCK 05000
.~ tstsE CONTAINS
g,7,p3 Igy0 MAT 10N.
upc3 SEPARATION THIS
L.m.w :
S..n.~ a 31;,A.a h s.
SECnuN li/ Amenc EALc;Y ACI 1954.
y G215 Dzc03IROLLED.
V10LATIO :0 DF THE FRvIECTION
DI
REQUICMTS OF 10 CFR 73.21
David R_McGuire__
/ u
SU3JEI10 CIVIL 03 CRIMINAL SANCTIONS.
(; J;)
(SIG ATU3
d
SAFEGUARDS INFORM
n@
(=4
fg
SAi-tGimRU3 inrLiuhTjGN
-
-
,
,
,
,
G:orgia Power Company
2
tMR 021992
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
F. Long, Acting Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
Appendix A. Notice of Violation
(Safeguards Information)
Inspection Report Nos. 50-321/82-05 and
50-366/82-05 (Safeguards Information)
cc w/ encl:
J. T. Beckham, Vice President
and General Manager
M. Manry, Plant Manager
C. E. Belflower
bcc w/ encl:
,/
Document Management BranchV
bcc w/ Inspection Summary:
NRC Resident Inspector
State of Georgia
Hugh S. Jordan, Executi a Secretary
,
Georgia Public Ser..ce Commission
'
l
JRogg(kh
RII
R
RII
RII
RII
-
RGoode:my
DMcGuire
AGibson-
ee
FL g
02/ /82
CJ/o/82
03 / s /82--
CJ/} /82
(3/2-/82
appz
MOME CD::TAills
EAIEGUAEDS I?!F0FXATIO:7'
UPD:1 SEPARATION THIS
PAGE IS DECO:;Iggttgr),
SAFIGUARDS INFORMATION
'
.
a
a