er SEABROOK STATION Lj PUBLIC SERVICE Engineedng Office:
Companyof NewHampshre 1671 W;rcester Road Framinoham, Massachusetts 01701 (617) - 872 - 8100 March 8,1982 SBN-222 T.F. B 4.2.7 United States Nuclear Regulatory Commission Of fice of Inspection and Enforcement Region I 631 Park Avenue -
King of Prussia, PA 19406 Attentlon:
Richard W. Starostecki, Director Division of Resident and Project Inspection Re f ere nc es :
(a)
Construction Permits CPPR-135 and CPPR-136, Docket Nos.
50-443 and 50-444 (b)
USNRC Letter, dated February 10, 1982, " Inspection Nos.
50-443/81-14; 50-444/81-11" R. W. Starostecki to W. C.
Tallman Su bj ec t :
Response to Inspection Nos. 50-443/81-14; 50-444/81-11
Dear Sir:
In response to the violation, which you reported in Reference (b), PSNH offers the following:
NRC Notice of Violation:
(443/81-14-01 and 444/81-11-01) 10 CFR 50, Appendix B, Criterion III states, in part that,
" Design changes shall be subject to design control measures commensurate with those applied to the original design.
." These measures shall assure that regulatory requirements and the design bases "are correctly translated into specifications, drawings, procedures, and instructions."
The Seabrook Station PSAR for Units 1 and 2 states, in part, in Paragraph 17.1.3 that, "Each organization performing design activities for items covered by this program shall maintain design control measures.
The measures shall consist of procedures.
UE&C Specification 248-51 states, in part, in Paragraph 3. 5. 7.1 that,
"All shall be located with respect to the as-built location of the ha ng e rs.
installed piping.
taking into considerat f orr the variat ion necessary to accomodate thermal growth."
Contra ry to the above, as of November 27, 1981, modifications to pipe haager M/S-1812-SG-08 (Unit 1) and M/S-2-1812-SG-08 unit 2) had been accomplished in accordance with a design change (Engineering Change Approval, ECA 25/0665A) which did not take into engineering consideration the thermal growth of the supported piping and which therefore provided the potential, in service, for adverse impact upon branch piping connections, leading to a loss of service water coolant.
8204070519 020402 PDR ADOCK 05000443 PDR a
1 United States Nuclear Regulatory Cornission March 8, 1982 1
Attention: Richard W. Sta rostecki Page 2 This is a Severity Level V Violatlan (Supplerient II).
i
Response
8 +
Corrective Action Taken an Results Achieved f
Contrac tors, subsequent to February 28, I?82, have not been permitted to install structures or supports within 3" of any propc*Jon from a pipe such as va lve s, branch lines, lugs, instruments, so'as to permit f ree thermal growth of the pipe.
Cont ractors have been directed to contact UE&C Enginecing for resolution if support locations shown on drawings conflic* with the 95cve re qui reme n t.
1982, will be S ecked to determine h
Supports installed prior to Fe b rua ry 28,.
conformance to the requirements listed above.
In case di deviation, the actual location of the support with respect to the va lve, branch line, lug, instrument, etc., shall be measured and transmitted t'o UE&C Engineering for resolution.
Contractors were advised of these instrui zions in UESC Engineering Change Authorization (ECA) 19-0218F, dated January 26, 1982.
4 Corrective action will be achieved by A " f 1 30, 19 87.~
UE6C has been directed by YAEC to perform an ii.-dep:;h study of component separation and promulgate separation criteria for site cont ractor application. YAEC will keep the FRC Senior Resident Inspector appraised regarding progress of this study.
YAEC will include this study in its future verifications items system to assure that the study is completed and results disseminated.
Ve rf t ruly yours,
\\
YA'lKEE ATOMIC ELECTRIC COMPANY jy/)~j
?
..]
h /JQl'Y]
ohnson W.
Vice President COMMONWEALTil 0F MASSACHUSETTS) i
" ~
i
)ss MIDDLESEX COUNTY
)
Then personally appeared before me, U. P.. Johnson, who, being, duly sw un, j
did state that he is a Vice President of Yankee Atomic Electric Codpany, ti at s
he is duly authorized to execute and file the foregoing request in the name' and on the behalf of Public Service Company of New Hampshire and that fhe statements therein are true to the best of his ':nowledge and belief.
\\. E a
/)
fY
. 9 *\\
h+f
\\,}
A. LV 14/gep/re, Jr. U Notary Public ji
,igi My Commiss4cn Expires August S. 1988 y$*
.?Q Oh
- o. ;'s
)
7 fN
.