ML20050B865

From kanterella
Jump to navigation Jump to search
Comments on Transmitting Des Re License Renewal & Power Increase
ML20050B865
Person / Time
Site: National Bureau of Standards Reactor
Issue date: 04/02/1982
From: Blanchard B
INTERIOR, DEPT. OF
To: John Miller
Office of Nuclear Reactor Regulation
References
ER-82-374, NUDOCS 8204070502
Download: ML20050B865 (1)


Text

e.

<1 s

  1. 4 United States Department of the Interior OFFICE OF Ti!E SECRETARY WASHINGTON, D.C.

20240 C3

  1. 9

/ ['N 4

j ER 82/374

.4 0+

2 *{~{.g,0 %6 " $ <%@

APR f i t

-, h,Q s

-\\

c A

-6 N+f f,r, a

',h 94,y v

/)

n James R. Miller, Chief Standardization and Special Projects Branch Division of Licensing Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Miller:

l Thanl< you for your letter of February 18,198?, which transmitted copies of the droit l

environmental impact statement related to the License Renewal and Power increase for the National Bureau of Standards Reactor, Montgomery County, Maryland. We have reviewed the draf t statement and have the following comments.

Water Sampling The streams sompled in the environmental monitoring program should be named and shown on figure 4.2. Consideration should be given to including Lol<e Elysium, downstream from the reactor on the Muddy Branch tributory that drains the reactor site, in the sampling programe Seismicity While the discussion of the seismicity of the area around this site is reasonable, there is no indication as to the manner in which this information was used to influence the design of either the reactor building or the equipment within that building. The final statement should indicate how this data was used in the design of the facilities.

We hope these comments will be helpful to you in the preparation of a final statement.

Sincerely, f,b(,6V fZfd I

uBruce Blanchard, Director Environmental Project Review COO 8204070502 820402 PDR ADOCK 05000184 D

PDR

- - - - _ _ _