Text
_
~
APPEl(DIX A NOTICE OF VIOLATIO:1 Consolidated Edison Coopany Docket flo. 50-247 Indian Point Unit 2 License flo. DPR-26 As a result of the inspection conducted on February 1-28, 1982, and in accordance with the Interim Enforcement Policy 45 FR 66754 (October 7,1980), the following violations were identified:
A.
Technical Specification 3.13.C, Penetration Fire Barriers, requires that the penetration fire barrier between the Primary Auxiliary Building and the electrical tunnel shall be functional at all tipes.
If the require-ments of 3.13.C cannot be satisfied within one (1) hour, a continuous fire watch shall be established.
Contrary to the above, on February 22, 1982, the inspector observed two openings in the penetration fire barrier between the Primary Auxiliary Building and the electrical cable tunnel, tio fire watch was posted in the area.
This is a Severity Level V Violation (Supplement I).
B.
Technical Specification 3.3.D requires that portions of the four weld channel and penetration pressurization system zones be pressurized at or above 47 psig.
Contrary to the above, on February 24, 1982, feedwater penetration "G" and steam penetration "A", portions of the weld channel and penetration pressurization system required to be pressurized, were found isolated and depressurized.
This is a Severity Level V Violation (Supplement I).
C.
Technical Specifications, Section 3.2, Chemical and Volume Control Sys-tem, requires that two boric acid transfer pumps shall be operable.
During power operations, one boric acid transfer pump ray be out-of-service, provided the pump is restored to operable status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
Contrary to the above, the licensee's test results obtained in'accordance with Procedure PT-lM2, Revision 1 Boric Acid Pumps Operational Test and Inspection, on April 17,1981 June 4,1981, July 8,1981, and February 11, 1982, indicate that the pumps failed to meet operability criteria specified in Procedure PT-H42.
This is a Severity Level IV Violation (Supplement I).
8204070490 820319 PDR ADOCK 05000247 O
s...
j
' O.
T:chnical Specification 6.8.1 requires that written procedures be
-established and implemented. Health Physics Procedure HP 2.1, Radiation Work Permit and Radiation Work Authorization Revision
- 4. September 2,1981, paragraph 8.2, requires that protective clothing specified on any posted entry requirements sign shall be worn.
Contrary to the above on February 22,1982, a fire watch, assigned to the electrical cable tunnel, entered the area without the benefit.
of the protective clothing described on the HP sign posted at the electrical cable tunnel access point.
This is a Severity Level V Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Consolidated Edison Company of New York. Inc..'is-hereby required to submit to this office within thirty
- days of the date of the Notice, a written statement or explanation in reply, includingi(1) the corrective steps which have been taken and the results achieved;. (2) corrective steps which will be taken to avoid further violations; and (3) the'date when full compliance will be achieved.
4 Under.the authority of Section 182 of the Atomic Energy Act of 1954, as i
amended, this response 'shall be submitted under oath or affirmation.
Where good cause is shown, consideration will be given to extending your response time.
N' g 19 original Signed By: - 0 3. APJggrg
-Dated 4
R. W. Starostecki, Director Division of Project and Resident Programs 1