- l U.S. NUCLEAR REGULATORY COMMISSION REGION III Report No. 70-36/82-02(DETP)
Docket No. 70-36 License No. SNM-33 Safeguards Group III L,censee:
Combustion Engineering, Inc.
Nuclear Power Systems Windsor, CT 06095 Facility Name: llematite Fuel Fabrication Plant Inspection At:
IIematite, M0 Inspection Conducted: March 8-12, 1982 Date of Last Material Control and Accounting Inspection:
July 20-23, 1981 Type of Inspection:. Routine Unannounced MC&A (Safeguards)
Inspectors:
d<r J/> k# #
A. G. Finleyf/
Date Auditor hhV$+Ah 3/hffY
["J.Blaylock V
Date Safeguards Analyst, HQ Approved By:
tt _ _
) 89 I
.' R. Creed, Chief Da t'e Safeguards Section Iaspection Summary Inspection on March 8-12, 1982 (Report No. 70-36/82-02(DETP))
Areas Inspected: Facility organization, facility operation, measurement controls, shipper-receiver differences, storage and internal control limit of error verification, records and reports, and management of materials control.
The inspection involved 74 inspector-hours onsite by two NRC inspectors and was begun during the regular hours.
.Results:
The licensee was found to be in compliance with NRC requirements
-in the eight areas examined during the inspection except for the following one item:
K okoh$$6 PDR
Failure to control by record,16 tamper-safe seals issued for use so as to determine whether the seals were used, lost, or unused.
(Details Part 2.790(d) Information) i 2
!