Monthly Operating Rept for Sept 1980
ML20050B749
Person / Time
Site: Beaver Valley
Issue date: 10/07/1980
From:
DUQUESNE LIGHT CO.
To:
Shared Package
ML20050B748 List:
References
NUDOCS 8204070317
Download: ML20050B749 (4)


Text

__

DUQUESNE LIGHT COMPANY Beaver Valley Power Station NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE - SEPTEMBER 1980 September 1 Station in Operating Mode 5 with the reactor coolant system through at atmosphere pressure and a system temperature of approximately September 21 90F.

The coolant level was being maintained at approximately mid elevation of the Cold Leg loop piping.

September 22-Station in Operational Mode 5.

Filled the reactor coolant through system and pressurized the coolant system with nitrogen.

September 23 System pressure of 325 PSIG was reached on September 23.

September 24 Station ht 0perational Mode 5 with an approximate system pressure of 320 PSIG and an approximate system temperature of 100F.

Reactor Coolant System Fill and Vent was performed and System Heat-up was begun.

System pressure was reduced to approximately l

100 PSIG to draw a steam bubble and at 1545 hours0.0179 days <br />0.429 hours <br />0.00255 weeks <br />5.878725e-4 months <br /> a steam bubble was established in the pressurizer.

The Residual Heat Removal System was also in service.

September 25 Station in Operational Mode 5 with an approximate system through pressure of 300 PSIG and approximate system temperature of September 30 120F.

The steam bubble was maintained in the Pressurizer with Residual Heat Removal System in service.

MAJOR SAFETY - RELATED MAINTENANCE - SEPTEMBER 1980 J

Beaver Valley Power Station is presently shut down for major system modifications required by the Nuclear Regulatory Commission.

The major modifications are performed as construction activitio. au;.J.ur jobs are performed as station maintenance activities.

The following items were performed or in progress during September, 1980.

1.

Final pre-heat-up inspections of the re-installed Bergen-Patterson large-bore snubbers were completed.

These snubbers will be inspected agaln at Mode 3.

2.

Installation and initial construction-testing of the fourth, and last, chemical addition spray pump were completed.

These pumps add sodium hydroxide solution to the quench spray during emergency containment depressurization.

)

3.

Inspection and modification of pipe hangers, supports and base plates located inside the containment were completed.

Final engineering review was in progress. Modifications of hangers, supports and base plates located outside i

the containment were in progress.

i 4.

Operational testing of the reactor coolant pumps was performed after modifi-cation of the motor thrust runners.

5.

Calibrations and fuctional checks of station instrumentation required prior to Mode 4 operation were begun by the station instrument maintenance section.

j 8204070317 001010 PER ADCK:K 050'CX)334 i

R PDR

OPERATING DATA REPORT

' ~

DOCKET NO. 50-334 aw DATE 10/7/80 COMPLETED BY D-L Ti tico TELEPHONE. 41' '4'-5308 OPERATING STATUS

1. Unit Name:. Beaver Valley Pcver Station. Unit #1 N8888
2. Reporting Period: Seotenber. 1080
3. Licensed Thermal Power (MWt):

7"A

4. Nameplate Rating (Gross MWe):

923 852 S'. Design Electricai Rating (Net MWe):

O'2

6. Maximum Dependable capacity (Gross MWe):

810-

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give P -

ons:

9. Powerlevel To Which Restricted. If Any (Net' MWe):

None

10. Reasons For Restrictions.If Any:

N/A This Month-Yrao-Date

' Cumulative

11. Hours in Reporting Period 720 A57m 38.735
12. Number Of Hours Reactor Was Critical 0

0 13,744.71

13. Reactor Reserve Shutdown Hours 0

0

'4.482.8

14. Hours Generator On.Line 0

0 13,105.07 IS. Unit Reserve Shutdown Hours 0

0 o

0 0

26,974,253.33

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 0

8,277,940

18. Net Electrical Energy Generated (MWH) 0 0

7,570,743

19. Unit Service Factor 0

0 34.8

20. Unit Availability Factor 0

0 34.8 1

21. Unit Capacity Factor (Using MDC Net) 0 0

27.2

22. Unit Capacity Factor (Using DER Net) 0 0

25.8

23. Unit Forced Outage Rare 0

0 46.4

24. Shutdowns Scheduled Over Next 6 Months (Typr Date.and Duration of Eachi:

Maior Modifications Outage (December, 1979 through October 18, 1980)

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

October 18, 1980

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved 1

INITIAL CRITICALITY N/A N/A INITIA L ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A (9/77)

AVERAGE DAIL? UNIT POWER LEVEL

^ '

50-334 DOCKET NO.

UNIT 3VPS Uni: #1 10/7/80 DATE D. R. TW COMPLETED BY TELEPHONE 412-643-5308 MONTH Sectember, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NetI (MWe-Neti 1

0 37 0'

2.

O gg.

o 3

0 39 0

0 0

4-20 0

f 21 0

0 0

6-22 0

T 0

g 0

t 24 0

0 o

9 10 0

26 I

0 0

27 0

0 12 28 13 0

0 79 0

14-30 0

0 15 3t 16 0

j l

INSTRUCTIONS On this format. list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whale megswait.

J (9/77) l

s UNITSilUIDOWNS AND POWER REDUCTIONS KE NAIE BVIS nit #1 DATE 10/7/80 REPORT MONill September. 1980 COMPLETED BY D. R. Timko TELLrilONE 412-643-5308 "y

.! E 3

)Y Licr: sce E t, Cause & Conseclise W.

Ih'e k

5E 4

2 s ac Event 3, ~!

9-$

Ateion lo H

j j ;p, g Repost a mO j'

Pieveni Recunence 6

1 010180 S

6575 11 1

N/A ZZ ZZZZZZ Unit shutdown for major modifications as required by the Nuclear Regulatory Commission, including NRC Bull' tins IEB 79-02 e

and 79-14.

1 I

2 3

4 F:. Forced Reason-Method:

Exhibis G. Instsuctions 5: Schedu!cd A Equipment Failure (Expl:In) 1-Manual foi Piepaiaiion of Data ll-Maintenance ci Test 2-Manual Scis n.

Ents) Sheces f or 1.itensee C Refueling 3 Autinnatic Strant.

Event Repine i1.I'R11:ile INURI G D Regulatory Restaletlun 40ther ttimplain t 01611 l'. Operalos l'ealning & license I:xaminalion F Adminisiralive 5

U.Operallonal 1:s sor liimplain) lishibli ! - Same'Somee 07/77) ll Oihes t Eiplain)