Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20207G2961986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20133N6201985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program 05000286/LER-1994-010, :on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised1994-11-0707 November 1994
- on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised
ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20044B8461993-03-0404 March 1993 Part 21 Rept Re Possible Safety Implications in Motor Operated Valve Evaluation Software Program Re Use of Total Thrust Multiplier.Utils Advised of Problem & Recommended Corrective Action in Encl Customer Bulletin 92-06 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program JPN-90-035, New York Power Authority Annual Rept for 19891989-12-31031 December 1989 New York Power Authority Annual Rept for 1989 ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 05000286/LER-1989-013-01, :on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities1989-07-28028 July 1989
- on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities
ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point 05000286/LER-1989-007, :on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained1989-04-17017 April 1989
- on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained
ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept 05000286/LER-1989-001, :on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded1989-03-0303 March 1989
- on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded
ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed 05000286/LER-1989-003-01, :on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed1989-02-23023 February 1989
- on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed
ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 1999-02-09
[Table view] |
Text
.
OPERATING DATA REPORT DOCKET NO.
50-286 DATE 4-3-81 COMPLETED BY C. ConnoJ1 TELEPHONE ({14) 739-8200 OPERATING STATUS Notes
~ -
- 1. Unit Name: ndian Pnine__Nn_1 ni, clew pnrgy pinne
- 2. Reporting Period:
March 1981
- 3. Licensed Thermal Power (51Wt):
1025
- 4. Nameptste Rating (Gross $1We):
1013 S. Design Electrical Rating (Net 51We):
965 926
- 6. Sf aximum Dependable Capacity (Gross MWe):
891
- 7. Slaximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:
,c NONE
- 9. Power Level To Which Restricted. lf Any (Net 51We):
NA
- 10. Reasons For Restrictions. lf Any:
This Month Yr. to.Date Cumulative 744 2,160 40,201
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 6.0 734.7 27,484.7 0
- 13. Reactor Reserve Shutdown Hours
. 0 0
- 14. Hours Generator On Line 0
728.7 26,431.8 0
0 0
- 15. Unit Reserve Shutdown Hours 0
2,074,821 69,706,091
- 16. Gross Thermal Energy Generated (MWH) 0 604,010 22,195,511
- 17. Gross Electrical Energy Generated (MWH) 0 579,583 21,293;743
- 18. Net Electrical Energy Generated (MWH1 0
33.7 65.7
- 19. Unit Service Factor 0
33.7 65.7
- 20. Unit Availability Factor I 'q 0
30.1 M
- 21. Unit Capacity Factor (Using MDC Net) 0 27.8 a4.9 U
- 22. Unit Capacity Factor (Using DER Net) 100 66.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Eacht:
^
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Ac'hihed '
INITIA L CRITICA LITY N/A N/A INITIAL ELECTRICITY N/A.__
N/A COMMERCIAL OPERATION N/A N/A s
NU I 040 00 OO2OJ O
R
(_ -
AVI:ItAGl: D AILY UNII l'0Wl:lt 1.1. VEL i
DOCKET NO.
Sn-28f.
leidi;in Poi nt UNIT 180.3 4-3-81 DATE COMPLETED BY C. Conne11 TELEPl!ONE 914-739-8200 f4 arch 1981 MONTil DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) as O
j7 0
0 0
2 18 0
0 3
39 4
0 20 0
0 0
5 21 6
0 22 0
0 3
0 7
0 0
8 24 9
0 25 0
0 0
10 26 11 0
27 0
0 0
12 28 13 0
29 0
14 0
30 15 0
33 0
0 16 INS 7 RUCTIONS On this format. list the aserage daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
=
UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-286 UNIT NAME Indian Point Unit, 8.
DATE 4-1-91 REPORT MONTil March 1981 COMPLETED llY
- c. connel1 TELErilONE (9141 733-8200 1
1 f*3 E. ?
3 Y
Licensee
,E-r, 1,
Cause & Corrective No.
Date g
gg g
jg5 Event g?
9 Action to
$E 5
H
- 3. i5 =g Report a mU EL Present Recurrence u
O 02 10131 P
744 A
3 N/A IIA Turbin One L-1 blade failed on the 31 low pressure turbine causing significant turbine blading and, condenser tube damage. Damaged turbine blades were repaired / replaced. All three low pressure turbines were inspected and any suspect blades sere replaced.
Damaged condenser tubes have been plugged.
I 2
3 4
F: Forced Reason:
Method:
Exhibit F Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data Il-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 1 Automatic Scram.
Event Report (Ll'R) Fde(NUREG-i D Regulatory Restriction 4 O her(Explain) 0161)
E-Operaint Training & License Examinatiorr F Administrative 5
G-Operational Eirur (Explain)
Exhibit 11-Same Source P)/77)
Il Other ( Explain) o th 1
n
\\
o i
tc s
A re e
t v
D D
t i
T T
i t
R R
m c
s e
w w
n r
e e
a h
r n
n r
t o
t 1
8 n
C d
d 9
o e
e d
1 M
l l
e l
l r
h a
a i
c t
t a
r s
s p
a n
n e
M I
I R
e c
n n
o a
i r
n t
e o
c l
i n
o t
T u
t a
R f
c f
i O
l P
a o
d E
H n
R t
I u
I o
su Y
s o
R a
e O
w n
G o
E D
r T
T r
A R
E C
C e
e g
g n
n n
a r
I a
R u
R t
Y w
e L
t w
o r
l n
o r
iT e
r r
l N
m r
a a
O p
a N
e M
i N
s u
S q
S C
P E
C R
C.
R R ro B
A 4 t 0
0 3 a 1
3 c
4 4
&i D
- D d
ET ET 1 n TR TR 3i C
I 2
3 5
5 4
3 7
8 6
R.
O 0
l l
1 l
W 1
1 1
C C
C I
I I
e t
1 1
1 aD 8
8 8
/
/
/
6 6
9 2
2 0
/
/
/
3 3
3
2HOffrilLY Malt 1TEllAt1CE REPORT March 1901 Honth
- DATg, W.R.
8 EQUIPMEtrP MALFUNCTION CORRECTIVE ACTIOt1 3-03 I-1852 Component Cooling line flange Leaking Gasket Renewed Gasket to #34 RCP 2-25 I-1835 RCS Valve 455 B Gasket Leak Renewed Gasket 3-06 I-1854 Mov 536 Defective Limitorque Operator Renewed Operator 3-05 I-1857 CVCS Valve 1844/1846 Worn Packing Replaced Packing 3-07 I-1820 Valve 891 C Defective Ring Terminal Connection Renewed R1ng Terminal 3-07, I-1848 SI valve 887 B None Replaced oper, w/Enviornmentally Qualified Operator 2-18 I-1809
- 32 I A Compressor Compressor Knocks Readjusted Crosshead Clearances 3-03 I-1800 "34 RCS Standpipe Valve Valve leaked through Repaired valve 3-02 I-1849 32 Fan Cooler Unit Cooler Leak Repaired leak by soldering 2-28 I-1837 Prim. Sample Valve 955A Packing Leak Renewed Valve 2-24 I-1833 Polar Crane Crlmped Auxiliary Hook Cable Renewed Cable 2-26 I-1830 32 Boric Acid Transfer Pump Mechanical Seal Leaks Replaced Mechanical Seal and Pump Internals e
d
a a SUMfGRY CF OPEPATING EXPERZENCE MARCH 1981 Indian Point Unit 3 was shutdown for the entire reporting period.
Completed main turbine repairs, inspection, and reassembly. The reactor was brought critical on March 30 at 2135 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.123675e-4 months <br /> and shortly there after shutdown because of " drifting
- problems with the individual rod position indicators. This problem was resolved and the reactor brought critical again at 1943 hours0.0225 days <br />0.54 hours <br />0.00321 weeks <br />7.393115e-4 months <br /> on March 31.
As the main turbine was being brought up to speed there was a turbina trip on an electrical fault.
The fault was determined to be located in #32 nain transformer. The transformer is being disconnected in preparation for returning to service on #31 main transformer.
's
$