ML20050B515

From kanterella
Jump to navigation Jump to search
Forwards Contentions of Carolina Environ Study Group, Palmetto Alliance & Charlotte-Mecklenburg Environ Coalition for 820112-13 Hearing.Aslb Admitted Half of Intervenors Contentions.Requests Review of Des,Fes & Ser.W/O Encl
ML20050B515
Person / Time
Site: Catawba  
Issue date: 03/26/1982
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Mattson R, Thompson H, Vollmer R
Office of Nuclear Reactor Regulation
References
NUDOCS 8204050428
Download: ML20050B515 (3)


Text

-

,.-;SN MAR 2 0 52[- w.

'fv' Docket tios.:

50-413/414 g

u.

g,

~*

4 nr10M493 t FO't:

R. 11. Vollner, Director, Division of Enqineer $

R. J. "attson, 91 rector, Division of Systels Intdorat. ion

'/

!!. L. Toonoson, Acting Director, Division of lio1aDFhttors/

Safety S.11. Ihnauer, Director, 9111sion of S3fety Technology B. K. Grines, Director, 91 vision of Enerqency Precaredness R. E. Cunninoha1, Director,11 vision of Fuel Cycle and

hterial Safety R. F. Burnett, Director, Divisioq of S3femords FR91:

R. L. Tedesca, Assistant Director for Liceqsinq Olvision of Licensina 511]ECT:

CD'1TENTIOM - CATA'l3 A ASL9 HEAP.IMG On J nuary 12 and 13, 1992, the Catw53 Board conducted a orehaaring conference in York, South Carolins, nursulnt t 310 CFR 2.751a. The Board ad11tted the Carolina Environmental Stu:iv Groun (CESG), the Palnetto Alliance (Palnetto),

and Charlotte 'iecklen'neg Environ 1ont11 Coalition (C'tEC) as Intervenors in the Catayha nroceeding. CESG filed 19 contentions, Palmetto 29 and C"EC 4

The Board ad11tted half of th2 Intervenore.' nroposed contentions, in

. hole or in olet. "omver, only one of these contentions (Palmetto f?7) is beinq id iitted unconditionally. Twentv-five contentions are beinn ad1ittei suStect to certain s7ocified conditions due to lack of snacificity in the contentions. Copies of these contentions (followed by the Board's coments on snecificity) are enclosed and are 5einq distrihuted to aach of yotre oranches iq order that the staf f can addres. the issue of each contention in the 9ES, FES, Draf t 3ER 1r final SER.

T1is rny oreclude th? need for subsequent uritten staf f testimqy for oa':S contentio1.

Also, the associated technical reviemr will he respons151e to ap;)eir as a staff witness on the resoective contention.

8204050429 820326 PDR ADOCK 05000413 G

PDR omcr >

su m ud

. I................

any.

. j.

mc sonu m oa-o wcu uo OFFICIAL RECORD COPY usa m m - m wo

i

.f i

OELD (G. Johnson X27445) and DL (<. Jabbour, X 27321) stand ready to provide assistance and guidance in co1oleting this very incortant task that will have 1onq-tern consequences.

Original signed by Robert L. Jede#C Robert L. Tedesco, Assistant Director for Licensing Division of Licensing 1

Enclosures:

As stated cc: !!R:1 Assistant Directors 14RR Branch Chiefs 4

i F. Pagano, IE i

G. ticCorkle, fMSS J.11alaro, RES i

C. !!acDonald, friSS l

J. Saltzaan, SP 4

b E

9 i

l i

1 i

?

' *SEE PREVIOUS WHITE A

n

..DL.:LBJ4.b..LA OL,LB#.4._.D.L :.LM.4.........,AR.,

C....

omce p

.om- >..*aano.ur.;.e a....*Mhn.c.4n... *.EAds. nam........h..

. 9...

  • an.4/n........iaa m..........*.3.l24,za,2,.,,,,3,gyzaa,,,

I wac ronu ais po-so> uncu ano OFFICIAL RECORD COPY usom mi_us..

. ~.

-. ~ __ -_

~

DISTRIBUTION Docket File (50-413/414)

OELD LB#4 R/F OIE (1)

EAdensam bec: L PDR KJabbour NRC PDR MDuncan TERA RTedesco ACRS (16)

Docket Hos.:

50-413/414 TIC /NSIC

!!E"0RANTJ!i FOR:

R. !!. Vn11nce, Director, Division of Engineering R. J. Mattson, Director, Division of Syste.1s Integration H. L. Thonpson, Acting Director, Division of Human Factors Safety S.11. Hanauer, Director, Division of Safety Technoloqv i

FR0il:

R. L. Tedesco, Assistant Director for Licensino, j

Division of Licensing SU3 JECT:

CONTENTIDNS - CATAW3A ASLB llEARING

/

/

/

On January 12 and 13,1982, the Catawha Boara gn<fiscted a prehearing conference in York, South Carolina, pursuant to 10 CFR 2.751a. The Board ad71tted the Carolina Environmental Study Group (CESrg,' the Palnetto Alliance (Palnetto),

and Charlotte 'fecklenburq Enviromiental C9411 tion (CMEC) as Intervenors in the Catawba proceeding. CESG filed Ji contentions, Palnetto 29 and CMEC 4.

The Board ad71tted half of the Intfrvenors' proposed contentions, in whole or in part. Houever, only onc/of these contentions (Palnetto #27) is beinq ad11tted unconditionally / Twenty-five contentions are beina ad11tted subject to certain specified en itions due to lack of soecificity in the contentions. Copies of these ontentions (followed by the Board's coments on specificity) are enclose nd are being distributed to each of your branches in order that the taff addresses the issue of each contention in the DES, FES, Draf t SJ s or final SER. This may preclude the need for subsequent written staff testimony for each contention.

Also, the associated techotcal reviJwer ut be responsible to appear as a staff witness on i

the respective cont. tion.

DELD (G. Johnso 27445) and DL (K. Jabbour, X 27821) stand ready to provide assistance and Juidance in cmipleting this very imnortant task that will have long-term co equences.

Robert L. Tedesco, Assistant Director for Licensing Division of Licensing Enclosires:

As stated cc: NRR Assistant Directors NRR Branch Chiefs

/

..DL:LBJ4b WDi W4-...Dh'd,ep,am,,,

F. Pagano, IE d

4.--

ARA /.DL--

omce >

......... c.. n :cor' 1e.mS

+ r

,,,E A

,,, rte de s,782,,,

su m e>

..............L.. !M aro....ES.........K.J.a b b.9.u r :e bM.Du,n a,n co

.....<g 782 i 3/ 2....... 4... / 8f 3/,g /#f,,,,

37 37 C. MdcDonald, T!S nmey

.............g...3g.g... p...

anc renu ais commacu ono OFFICIAL RECORD COPY wom mi-mm

- - - -