ML20050B473
| ML20050B473 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/16/1982 |
| From: | Roy G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20050B474 | List: |
| References | |
| NUDOCS 8204050368 | |
| Download: ML20050B473 (2) | |
See also: IR 05000266/1982006
Text
. _ . - - - -
. . . -
IE HQRLE COPD.'
^
'
-
-
,
.
Ui
'i '.
.
MAR 10 N
k;
.:.
gj
co
e
r
%
~
Docket No. 50-266(DETP)
9
.
Docket No. 50-301(DETP)
S
SpC
,
Wisconsin Electric Power Company
--- [
g
}g
_.l_
. . .
NITN:
Mr. Sol Burstein
g
-
-
Executive Vice President
Power Plants
y=
//
231 West Michigan
Milwaukee,_WI 53201
As
/
to
Gentlemen:
This refers to the routine safety inspection conducted by Mr. P. C. Lovendale
of this office on February 22-26, 1982, of activities at the Point Beach
Nuclear Power Plant, Units 1 and 2, authorized by h7C Operating Licenses
No. DPR-24 and No. DPR-27 and to the discussion of our findings with
Mr. G. Reed and others at the conclusion of the inspection.
The inspection was an examination of activities conducted under your license
as they relate to radiation safety and to compliance with the Commission's
rules and regulations and with the conditions of your license. The inspec-
'
tion consisted of a selective examination of procedures and representative
s
records, observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
,
i
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
s
to file a request for withholding; cr.d (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information. If your receipt of this letter has been
,
1
T)M S
[f6
KO
$ll
'
[
u
_
. . _ _ .
. e k'
'
'
.
!
'
9
Wisconsin Electric Power Company
2
NAR 161982
'
,
.
delayed such that less than seven (7) days are available for your review,
9
'
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
~
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit. If we do not hear from you in this regard within
.
the specified periods noted abo % a eg; of this letter and the enclosed
inspection report will be placed in the Public Document Room.
'
We will gladly discuss any questions you have et,ncerning this inspection.
Sincerely,
N
b
G. W. Roy, Acting Chief
Technical Inspection Branch
Enclosure: IE Inspection
Report No. 50-266/82-06
and No. 50-301/82-06
cc w/ enc 1:
G. A. Reed, flanager
-
DtlB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Inspector
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
Public Service Commission
RII
RIII.,
I
RI I
'
'
Y
f
'){/
Iovendale/jp
Greger
lin
c,
3/12/82
hk'
/