Forwards IE Insp Repts 50-266/82-06 & 50-301/82-06 on 820222-26.No Noncompliance Noted
ML20050B473
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/16/1982
From: Roy G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20050B474 List:
References
NUDOCS 8204050368
Download: ML20050B473 (2)


See also: IR 05000266/1982006

Text

. _ . - - - -

. . . -

IE HQRLE COPD.'

^

'

-

-

,

.

Ui

'i '.

.

MAR 10 N

k;

.:.

gj

co

e

r

%

~

Docket No. 50-266(DETP)

9

.

Docket No. 50-301(DETP)

S

SpC

,

GI

Wisconsin Electric Power Company

--- [

g

}g

_.l_

. . .

NITN:

Mr. Sol Burstein

g

-

-

Executive Vice President

Power Plants

y=

//

231 West Michigan

Milwaukee,_WI 53201

As

/

to

Gentlemen:

This refers to the routine safety inspection conducted by Mr. P. C. Lovendale

of this office on February 22-26, 1982, of activities at the Point Beach

Nuclear Power Plant, Units 1 and 2, authorized by h7C Operating Licenses

No. DPR-24 and No. DPR-27 and to the discussion of our findings with

Mr. G. Reed and others at the conclusion of the inspection.

The inspection was an examination of activities conducted under your license

as they relate to radiation safety and to compliance with the Commission's

rules and regulations and with the conditions of your license. The inspec-

'

tion consisted of a selective examination of procedures and representative

s

records, observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

,

i

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

s

to file a request for withholding; cr.d (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information. If your receipt of this letter has been

,

1

T)M S

[f6

KO

$ll

PDR

'

[

u

_

. . _ _ .

. e k'

'

'

.

!

'

9

Wisconsin Electric Power Company

2

NAR 161982

'

,

.

delayed such that less than seven (7) days are available for your review,

9

'

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

~

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

.

the specified periods noted abo % a eg; of this letter and the enclosed

inspection report will be placed in the Public Document Room.

'

We will gladly discuss any questions you have et,ncerning this inspection.

Sincerely,

N

b

G. W. Roy, Acting Chief

Technical Inspection Branch

Enclosure: IE Inspection

Report No. 50-266/82-06

and No. 50-301/82-06

cc w/ enc 1:

G. A. Reed, flanager

-

DtlB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Stanley York, Chairman

Public Service Commission

RII

RIII.,

I

RI I

'

'

Y

f

'){/

Iovendale/jp

Greger

lin

c,

3/12/82

hk'

/