ML20050B468

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1982
ML20050B468
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/10/1982
From: Howlett G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20050B461 List:
References
NUDOCS 8204050363
Download: ML20050B468 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ ___

m. _. --

OPERATING DATA REPORT

]

DOCKET NO.

50-336 _

DATE 2-10-82 -

COMPLETED BY G,H, Howlett j TELEPHONE l'un 447-1791 '

OPER4 TING STATUS

1. Urd: Name: Millstent, ,y Notes
2. Reporting Period: January 1982 Items 20 f 21 -

2700 Cumulative are computed -

3. Licensed Thermal Power (Mht):
4. Nameplate Rating (Gross MWe): 909 using a weighted average. -
5. Design Electrical Rating (Net MWe): _ 870 ']
u. Masimum Dependable Capacity (Grou MWe): 895 --

i

7. Maximum Dependable Capacity (Net Mhe): 864
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons: __

NA _

}

9. Power Level To which Restricted. lf Any (Net MWe): -

NA

10. Reasons For Restrictions.If Any: M w

g

=

This Month Yr..to.Da t e Cumulatise

11. Hours in Reporting Period 744 744 53,496
12. Number Of Hours Reactor Was Critical 0 0 38,587.3
13. Reactor Resene Shutdown Hours 0 _

0  ;

2 A76.9

14. Hours Generator On.Line 0 _

0 37,001.5

!$. Unit Resene Shutdown Hours 0 0 I6. Gran Thermal Energy Generated (MWHI 468.2 ~J O 0 92,415,947 Z

17. Cross Electrical Energy Generated (MWHI 0 . ..._ O _ 30,001,497
18. Net Electrical Energy Generated (MWH) (-3,400) (-3,400) 28,750,361 "
19. Unit Senice Factor 0 0
20. Unit Asailability Factor 69.2 0 0 70.0 21 Unit Capacity Factor IUsing MDC Net 1 0 0 64.5 22 Unit Capacity Factor (Uning DER Net) 0 0
23. Uni Forced Outage Rate 63.5 a 0 0 24 _

20.4 _-

Shutdowns Scheduled Oier Neat 6 MonthsIType.Date, and Duration of Eachi 25 IfShutDown4:

End Of Report Period. Estimated Date of Startup.

26 -

Uniti in Test Status (Prior to Commercial 0perationi Forecast Achiesed -

INITI AL CRITICALITY _ NA g INITI A L ELECTRICITY tg g 004 MERCI AL OPER 4 TION _ tlA  ?!A NOTE:

0204050363 820211 Error in December 1981 report, item fl8 read 80,500, should have -'

PDR ADOCK 03000336 R

ection h -

I" C '

PDR noe* "EU

-~

s DOCKET NO.

50-336 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME m ilsune 4 DATE 2-10-82 REPORT MONT11 January 1982 COMPLETED BY -G. H. Howlett TELEPHONE (203) 447-1791 x 4431

'u c

-, _j g 'h j [] Licensee ,E -t, cL w N* DJte 9, 3? j jsE Event g o Cause & Cairrestive Ai;ssion tie y3 & ggg Report = vi O g Prevent Recussence d

11 811205 744 S C 1 fl/A fl/A ti/A Continuation of Refuel outage L frem previous month.

-l Summary: The unit remained shut down for refuel and maintenance throughout the report period.

m e

A\ IP. ACE D AILY L*N17 PObER LEVEL l

DUCK ET No. 50-336 g,,., 7 _ Millstone 2 DATE .2L-10-82 COMPl.ETE D BY 1 H. Howlett TELEPHONE .I203) 447-1791 Ext. 4431 MON 1 1 __. JANUARY._1932_.__. . -

cry AVER 4GE DAILY POhER LEVEL LAY

(\:We Net) AVER AGE DAILY TOWER LEVEL IMWe Net) 0 (-3) _

37 0 (~-4) 2 0 (-3) is 0 (-5) 3 0 (-3) 19 _

0 (-5) 4 O h 41._._. 20 0 (-5) 5 0 1 ,3J----

' 21 0 (-5) 6 0 (-4) 22 0 (-5) 7 0 (-4) ,3 -

0.(-5) 3 0 (-4) 34 0 (-5) 9 0 (-4) 2s _

0 ( _5) 10 0 (-4) 26 0 (-5) it . __ . 0 (-5) ,,

0_(-5) 12 0 (-5) ___ ,g 0 (-4) 13 0(M ,9 _ _ _ _ 0 (-5) 14 _. .._0(-5) ,o

0 (-5) 15 -

0_(.- 51 _ , . _ _, ,_.

31 - - -- -

16 0 (-5) 1% 1 R tic IlONS O:. th% f..m ai. Mi 0.e . s e*,;r deil,i .:.i: p...s c- lrie! it. MWe Net fm ca:h dt3 . the :t pc ist.; n u.th (nr..r.:e t o 9.c r . . nt w '.. le :*.r p u ri t .

('l a 'e 7 l l

=

-v

~

E 1

l Docket No. 50-336 Date: 2/11/82 Completed By: G.H. Howlett III Telephone: 203/447-1971 X4417 REFUELING INFORMATION REQUEST

1. Name of facility: Millstone 2
2. Scheduled date for next refueling shutdown:

Commenced refuel outage March 26, 1983.

3. Schedule date for restart following refueling: May 14, 1983 4

Will re'ueling or resumption of operation thereafter require a technical specification change or other license amendment?

It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments.

5. Scheduled date(s) for submitting licensing action and supporting information:

N/A 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: 217 (b) 288 8.

The present licensed spent fuel pool storage capacity and the size of any in rease in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

667 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1985, Spent Fuel Pool, full core off load capability is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles.

I

Occket No. 50-336

  • Date 2-11-82 Unit flame Mi11stene ]

Completed By G. H. Howlett Telephone (203) 447-1791 x 4431 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month December 1981 DATE SYSTEM COMP 0tJENT MAIflTEt1AflCE ACTION A summary of work performed during the current Refuel and Maintenance outage will be provided in February 1982 report.

I I

i o

O

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _