ML20050B460

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jan 1982
ML20050B460
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/11/1982
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20050B461 List:
References
MP-2-5061, NUDOCS 8204050354
Download: ML20050B460 (1)


Text

l

~

N

' IH)lflillinfi'l' IFI'll.I'l'Ilifi 3

T. "",r J." Z Z O ::~ ~

OM,Jn'o'. comtcricur osici

.'."'::'.7,;",~.~.':::"" "~ ~

o x>sssseis L

t a

~~;:::::::::?T '"~%

N February 11,198

'c N j

MP-E-5061 d

\\s

~

\\ - )

Director Office of Management Information and Program Contrc g APR2G8fgsam,,7Nb

'I U.S. fluclear Regulatory Connission gnEf,E.7 j

Washington, D.C.

20555 Sf

Reference:

Facility 6,arating License No. DPR-65 4/ E

/

Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relatino to Millstene Unit 2 for the Month of January,1982, in accordance with Appendix A Technical Specifications, Section 6.9.1.3.

One additional copy of the report is enclosed.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY fV 8tt/

E J. Mroczka Station Superintendent Millstone Nuclear Power Station EJM/GH/mo Director, Office of Inspection and Enforcement, Region 1 cc:

Direc tor. Office of Inspcction and Enforcement, Washingtor.,

D.C. (10)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C.

20555

{$S 820403o354 8202 gDRADOCKosooo$$6 t

-